95.   A construction management plan/strategy shall be prepared by a suitably qualified
      Registered Professional Engineer and submitted to Council in conjunction with any
      application for Operational Works. The construction management plan shall ensure no
      damage occurs to Council services and that any adverse impact on the local area due to
      the construction works is within the acceptable limit and properly managed to the
      satisfaction of Council.
96.   A Traffic Management Plan for the each separate demolition and construction phase of
      the development shall be submitted to and approved by Council at least 5 working days
      prior to the commencement of any Demolition or Building works or at least 5 working
      days prior to the pre-start meeting for Operational Works. The Traffic Management Plan
      shall include but not be limited to:
      96.1 Mitigate any adverse impact and disturbance on the local residential area and on
           the traffic in the local and main roads to acceptable limits;
      96.2 Mitigate dust disturbance caused by vehicles and machinery movements;
      96.3 Limiting the routes for the heavy vehicles to the major road network and limit the
           use of the local roads within residential area as access to the site;
      96.4 Indicate provision for on-site and off-site parking for the required workforce;
      96.5 Indicate the location of loading and unloading areas;
      96.6 Indicate the location of any “holding” areas for heavy vehicles and
      96.7 Operating hours.
      It is be noted that the Elm Street frontage of site shall not be used for access, parking or
      loading and unloading during construction (and post construction) phase unless a
      specific written permit obtained from the Department of Main Roads.
97.   Any damage caused to any public utility during the course of construction shall be
      repaired to Council’s standards and at no cost to Council.
98.   Any alteration of any public utility or other facilities necessitated by the development of
      the land or associated construction works external to the site shall be at no cost to
      Council.
99.   The transportation of all materials to and from the site shall be undertaken in a manner
      such that no particle matter escapes onto a public road. All vehicles carrying materials
      either to or from the site shall be covered to prevent materials including dust being
      windblown from the vehicle.
100. As Constructed drawings and data shall be certified by a qualified experienced Civil
     Engineer for design intent, and a Licensed Surveyor shall certify the cadastre and the
     location, level and type of all services and structures. All of which shall be submitted to
     Council for checking and for Council’s records.
      The data must fully detail levels for all engineering works including but not limited to
      roadworks, pathway, sewer main, water supply main, finished ground levels and
      pavement surface levels and drainage structures that will become Council asset. The
      data shall be submitted in the Asset Design and As Constructed (ADAC) digital format.
      (Guidelines on the use of ADAC are available at www.adac.com.au).
      Approval of works shall not be granted until all As Constructed information has been
      supplied and accepted by Council.
Waste Management
101. A Waste Management Plan (Operational) generally in accordance with Planning Scheme
     Policy No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial
     Premises”, must be submitted for the day-to-day operation of the development and
     approved by Council’s Health Section prior to issue of development permit for

                                                                                  Page 13 of 21

Used in these records

About this file

File size
121 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

B CURRENT DECISION NOTICE.pdf · 121 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.