B Current Decision Notice · 132007.2398
Attached to the e-mail 132007.2398.02 Request to change existing approval (1 of 3) Cover letter and site, floor & elevation plans.
132007.2398.01
103.2 10m vehicle length (not 9m as proposed) travel path and turning access.
103.3 Bulk bins (1.1 cu.m.) may also be considered provided HRV 12.5m length access
is available.
104. Plans are to be submitted for approval by Council’s Environmental Health Section of the
HRV 12.5m and 10m length waste vehicle travel paths and turning access. Plans must
clearly show routes and ensure that vehicle overhangs when turning are clear of all
obstructions e.g. posts, poles, fences, landscaping, etc.
105. All road traffic islands are to be trafficable for the waste vehicles.
106. All bins are to be placed in the correct position for collection at the roadside without the
need of the driver leaving the waste collection vehicle.
107. Council’s waste collection service during Stage 1 will not commence until the required
road access and waste storage facilities (including temporary ones), are in place.
108. A Waste Management Plan (construction and demolition) shall be submitted prior to
demolition, removal or relocation of any building other than a shed. Waste Management
Plan (construction and demolition) is also required for construction of 15 or more
dwelling units or for any business use of greater than 500m².
Waste Management Plans (construction and demolition) are required to be submitted in
accordance with Planning Scheme Policy 11, Waste Management Plans see table
below. Waste storage areas are to provide for adequate separation of all reusable,
recyclable and waste materials. These shall be located so that they are convenient and
safe to use. The Plan shall contain the following information:
The site area for the storage and separation of waste is to be shown on the plan
drawings accompanying the application.
A waste management table as indicated below is to be completed showing how
waste material is to be segregated - recycled – reused or disposed.
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected waste Estimated On-site Off-site *specify
materials volume *specify proposed *specify contractor and
(m³) re-use or on-site contractor and landfill site or
recycling recycling outlet other disposal
methods site
Excavation material
Green waste
Bricks
Concrete
Timber-please specify
Plasterboard
Metals - please specify
Asbestos
Other - please specify
Note * If a demolition contractor is undertaking works, then the Waste Management table is to be
completed by the demolition contractor.
The purpose of the Waste Management Plan is to facilitate the segregation of waste for the
effective reuse and recycling of such materials. Additionally Council rewards those who
segregate waste by significantly reducing disposal fees at the landfill some items are free. Higher
gate fees are charged for loads of mixed waste.
Page 15 of 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
B CURRENT DECISION NOTICE.pdfRelated documentApplication case desk ↗
About this file
- File size
- 121 KB (small file)
- File type
No other editions are linked here.