Council archive · source document
B Current Decision Notice · 132007.2398
Attached to the e-mail 132007.2398.02 Request to change existing approval (1 of 3) Cover letter and site, floor & elevation plans.
132007.2398.01
operational works. The Waste Management Plan (Operational) is to incorporate the
following changes to the proposed development:-
101.1 The proposed general waste bulk bin storage areas at the Aged Care Residence,
Apartment Building, Village Community Centre and temporary service to the
Independent Living Units whilst under construction, will require HRV 12.5m length
travel path and turning access.
101.2 If the waste storage area at the Aged Care Residence is not roofed, then the
actual bunded bin wash area is to be decreased in size to a maximum one square
metre area.
101.3 The waste storage area at the Apartment Building is to be relocated to the western
end of the adjoining car parking spaces, to allow ease of access for collection and
avoid the unnecessary manoeuvring through this car park.
101.4 The waste storage areas at the Aged Care Residence, Apartment Building, Village
Community Centre and temporary service to the Independent Living Units whilst
under construction, each require their own separate bin wash facility.
101.5 Submit details for approval of the proposal for bin washing of the recycling bins
located at the service nodals.
101.6 Council will not provide a roadside collection service to the 80L and/or 120L
general waste wheelie bins at the Independent Living Units after their completion.
The following options must be considered including client costings, and an
alternative proposed for approval.
101.6.1 Option 1: Continue the temporary service of the bulk bins as a
permanent arrangement. This requires:
Details of the permanent waste storage area (location, size, bin wash,
etc).
HRV 12.5m length travel path and turning access for collection.
OR
Option 2: Provide a roadside collection service of 240L general waste
wheelie bins (one bin shared between two units). This requires:
10m vehicle length (not 9m as proposed) travel path and turning
access for collection.
Where possible bins are to be placed on one side of the road only to
prevent duplication of travel path and minimise service time and
travel.
The “Turning Path 3” at the north western corner cul-de-sac to be
deleted. The bins for these nine units are to be placed at the nearest
trafficable thoroughfare for collection without any unnecessary
reversing or turning.
102. Provide an adequate number of recycling bins (240L or 1.1 cu.m. bulk) at the waste
storage areas of the Aged Care Residence, Apartment Building, Village Community
Centre and temporary service to the Independent Living Units whilst under construction.
The proposed HRV 12.5m length travel path and turning access to these areas will
suffice for collection.
103. The 240L recycling wheelie bin service to the completed Independent Living Units
requires:
103.1 Size of the service nodals to increase to accommodate eight bins i.e. one bin
shared between two units.
Page 14 of 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
B CURRENT DECISION NOTICE.pdfRelated documentApplication case desk ↗
About this file
- File size
- 121 KB (small file)
- File type
No other editions are linked here.