B Current Decision Notice · 132007.2398
Attached to the e-mail 132007.2398.02 Request to change existing approval (1 of 3) Cover letter and site, floor & elevation plans.
132007.2398.01
37. A new 2m wide concrete path shall be constructed along the Pearsons Road frontage of
the site and be extended along Elm Street to connect to the required bus stop on Elm
Street. The path shall be in accordance with Council’s design standards and to an
alignment that protects any significant vegetation and underground services. Two
pedestrian accesses to the site shall be provided along Pearsons Road frontage to
provide connection between the internal and external pathways. A development Permit
for Operational Works shall be required.
38. A pedestrian refuge island shall be constructed on Pearsons Road near its intersection
with Elm Street to provide connection between the new pathway in Pearsons Road and
the pathway in Elm Street.
39. Pram ramps shall be installed at road intersections and wherever needed to direct
pedestrians across the road. All pram ramps must be constructed in accordance with
Council’s design standards.
40. All paths, pram ramps, driveways and parking areas shall be designed and constructed
to ensure pedestrian safety using non-slip materials, to produce an evenly graded
surface finish, and to be in accordance with the Disability Discrimination Act 1992 and
Australian Standard 1428.1 Design for Access & Mobility.
41. Where applicable, all redundant vehicular crossings to the site shall be removed and
replaced by kerb and channel and footpath paving or landscaping in accordance with
Council’s Standard prior to the commencement of the use.
42. To ensure pedestrian safety between vehicles exiting the site and pedestrians on the
footpath, the driveway and any associated fencing or vegetation near the driveway shall
comply with the minimum sight line requirements as defined in AS/NZS 2890.1:2004,
section 3.2.4.
Bus Stop
43. The applicant shall design and construct a bus stop on Elm Street to the frontage of Lot
135 MCH 978 (north of 156 Elm Street) at approximately 70m south of the centre line of
Pearson Road intersection. A Development Permit for Operational Works shall be
required.
44. The proposed bus stop is to be “Indented” and be an “Intermediate Bus Stop” design
according to the TransLink Public Transport Infrastructure Manual shown on:
http://www.transinfo.qld.gov.au/qt/TransLin.nsf/index/ptim. The bus stop shall contain all
Mandatory and Preferred components as stated in Chapter 2 of the manual.
45. The design for the bus stop shall consider a Pedesrian Refuge Island and a coupled bus
stop (indented but unsheltered) on the opposite side of Elm Street for future
construction.
46. The bus stop required on Elm Street must be included in Stage 1 of the development.
Internal Driveways and Parking
47. The internal roads shall be concrete or bitumen sealed driveway of a minimum width of
6m for Primary Roads and 5.5m for Secondary roads and must comply with AS 2890.2-
2002. A Development Permit for Operational Works shall be required.
48. All parking areas and garages must be in compliance with the requirement of the current
Australian standards applicable to their use (AS/NZS 2890.1-2004 and/or AS 2890.2-
2002) with a minimum head clearance (headroom) at any point of 2.3m.
49. All vehicles shall enter and leave the site in a forward direction with the exception of
vehicles leaving driveway accesses of the duplex from independent living units fronting
Trading Post Road.
Page 7 of 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
B CURRENT DECISION NOTICE.pdfRelated documentApplication case desk ↗
About this file
- File size
- 121 KB (small file)
- File type
No other editions are linked here.