4. ASSESSMENT MANAGER CONDITIONS
When Conditions must be Complied With
1. Amended plans and associated reports must be submitted to Council prior to any further
development applications being made and must include the following to the reasonable
satisfaction of the Manager, Development Assessment:
1.1. Amended proposal plans to reference the required number of resident car parking
spaces, being 30 spaces in accordance with Table 9.4.1.4 Minimum parking
requirements of the Driveways and Parking Code.
1.2. Amended proposal plans to relocate visitor car park 4 from the access
handle/easement to a suitable location closer to Units 12-15.
1.3. Sensitive spaces, such as bedroom within 3m of noise generating areas are to be
acoustically treated with treatments shown on the amended proposal plans, such as
double glazing to ensure that the acoustic privacy of these areas is achieved.
1.4. Amended proposal plans to clearly detail that the pool and terrace areas and upper-
level balcony and windows are appropriately screened or treated to minimise
overlooking into the private open space areas of adjoining residents.
1.5. Confirm whether the combination of fill, retaining walls and fencing results in some
overall fence heights of approximately 4m, when viewed from the adjoining properties
and address the potential amenity impacts resulting from this outcome. Where
necessary, amend the proposal plans to address any impacts that cannot be
managed through reasonable and relevant conditions.
1.6. Confirm the methodology used to determine the proposed site cover shown on the
proposal plans. Specifically, why several portions of the built form of Units 1-5, 8, 10,
12-15, have been excluded from the site cover calculation.
1.7. Where required, provide amended landscaping, reconfiguring a lot and operational
works plans to reflect any changes made to the proposal plans.
Currency Period
2. This development approval lapses if the requirements of the conditions have not been
completed and lodged with Council by 1 April 2027, unless an application to extend the
currency period is approved by Council.
Stormwater Drainage
3. Prior to Council issuing a Development Permit, provide an amended Stormwater
Management Plan and associated Engineering Drawings that incorporates an allowance for
climate change in accordance with Performance Outcome 2 of the Water Quality and
Drainage Code. The amended package must include amendments to Engeny’s Stormwater
Management Plan and associated Engineering Drawings prepared by TOD Consulting, be
prepared by a suitably qualified person (RPEQ), and include in particular:
3.1. allowance for a 20% increase in rainfall intensity by the year 2100 for all modelled
scenarios (10% and 1% AEP event);
3.2. a revised assessment of non-worsening based on like-for-like scenarios for climate
change scenarios, based on the 1% AEP event (2100);
3.3. revised internal site drainage drawings and calculations to include a climate change
allowance; and
3.4. additional detail demonstrating how the “gap flow” has been calculated – nothing that
Section 4.1 of the Stormwater Management Plan suggests that development flows in
excess of the pipe network fail to report to the existing bioretention basin in Ely Street.
Page 2 of 5
Document Set ID: 23674313
Version: 6, Version Date: 08/04/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Preliminary Approval - Decision Notice - Approved by Delegation of Authority MCU24/0125 (As Published)Related documentApplication case desk ↗
Preliminary Approval - Decision Notice - Approved by Delegation of Authority MCU24/0125 (As Published)Related documentApplication case desk ↗
About this file
- File size
- 143 KB (small file)
- File type
No other editions are linked here.