Council archive · source document
Preliminary Approval - Decision Notice - Approved by Delegation of Authority MCU24/0125 (As Published) · RAL24/0021
Waste Management
4. Prior to Council issuing a Development Permit, provide a Waste Management Plan
demonstrating that all waste servicing and collection is to occur onsite. The Waste
Management Plan must be prepared by a suitably qualified person and include, in particular:
4.1. onsite collection of refuse/recycling must be undertaken using 1,100 litre, low-noise
waste containers – waste servicing, include the storage of waste containers, must
occur in locations that minimise the amenity impact on adjacent properties.
4.2. provision for on-site servicing by a Refuse Collection Vehicle (i.e., Dennis Eagle Elite
2 6x4 with rear lift configuration) – the Refuse Collection Vehicle must be able to enter
and exit the site in a forward gear while remaining wholly within the access driveway
(i.e., the access handle to Starboard Avenue).
4.3. If a Refuse Collection Vehicle is unable to remain wholly within the access driveway,
provide a revised development layout that accommodate on-site manoeuvring of a
Refuse Collection Vehicle; and
4.4. Compliance with The Noosa Plan 2020 – Waste Management Code and PSP9 Waste
Management.
5. REFERENCE DOCUMENTS
Not applicable.
6. REFERRAL AGENCIES
Not applicable.
7. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
Resubmission of Amended Plans Required
1. The conditions of this Decision Notice require resubmission of plan/s to Council with
amendments. Please address the amended plan/s to Council’s Development Assessment
Branch with the Reference No. MCU24/0125, OPW24/0158 and RAL24/0021.
8. PROPERTY NOTES
Not applicable.
9. VARIATION APPROVAL DETAILS
Not applicable.
10. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit Required Subject of the required Development Permit
Development Permit for Material Change of Multiple Dwelling (15 Units)
Use
Development Permit for Reconfiguring a Lot Community Title Subdivision (1 Lot into 15 Lots)
Development Permit for Operational Works Roadworks, Drainage Work, Stormwater,
Earthworks and Landscaping
Development Permit for Building Works All building works.
Page 3 of 5
Document Set ID: 23674313
Version: 6, Version Date: 08/04/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Preliminary Approval - Decision Notice - Approved by Delegation of Authority MCU24/0125 (As Published)Related documentApplication case desk ↗
Preliminary Approval - Decision Notice - Approved by Delegation of Authority MCU24/0125 (As Published)Related documentApplication case desk ↗
About this file
- File size
- 143 KB (small file)
- File type
No other editions are linked here.