Original source · versioned page text
Annex 11 - Code 11 - Marine Plants
Attached to the e-mail DA Application - Noosa Oyster Project (2 of 3).
Performance outcomes Acceptable outcomes Response
2. infrastructure, structures or buildings are not
expendable or not able to be relocated.
Note: Further detail on erosion control is provided in Tidal fish
habitats, erosion control and beach replenishment (FHMOP 010),
Department of Primary Industries and Fisheries, 2007.
PO18 The area that the beach replenishment is No acceptable outcome is prescribed. Not applicable.
to be carried out on is a high-energy, sandy
sediment shoreline with biological communities Works are not erosion control structures or beach
adapted to mobile sediments. replenishment.
PO19 Erosion control structures including beach No acceptable outcome is prescribed. Not applicable.
replenishment does not create terrestrial land,
unless it is a sacrificial dune or beach which Works are not erosion control structures or beach
forms an integral part of the erosion control replenishment.
design.
PO20 The beach replenishment work is No acceptable outcome is prescribed. Not applicable.
undertaken in a way that minimises the need for
other erosion control activities or works. Works are not erosion control structures or beach
replenishment.
PO21 The beach replenishment work is AO21.1 Beach replenishment will not require maintenance Not applicable.
undertaken in a way that minimises the more often than every two years.
frequency of any ongoing replenishment Works are not erosion control structures or beach
AND replenishment.
requirements.
AO21.2 A source of replenishment material for future Not applicable.
maintenance is identified and secured.
Works are not erosion control structures or beach
replenishment.
PO22 Erosion control structures are located No acceptable outcome is prescribed. Not applicable.
parallel to the shoreline and as far landward as
possible to avoid impacts to tidal land and Works are not erosion control structures or beach
marine plants. replenishment.
Dredging
PO23 Capital dredging is to create or provide access to No acceptable outcome is prescribed. Not applicable.
public infrastructure.
Works are not dredging and no dredging is proposed
Note:
1. Privately owned marina facilities or maritime infrastructure as part of the development.
development that is open to the general public and facilitates
State Development Assessment Provisions – version 2.6
State code 11: Removal, destruction or damage of marine plants Page 16 of 24