Annex 11 - Code 11 - Marine Plants
Attached to the e-mail DA Application - Noosa Oyster Project (2 of 3).
Performance outcomes Acceptable outcomes Response
unrestricted public use for fishing purposes may be
considered public infrastructure
2. Dredging for access to private structures that do not provide
unrestricted public use is not supported.
PO24 Maintenance dredging is consistent with an existing No acceptable outcome is prescribed. Not applicable.
development approval for dredging; and within approved
profiles for navigational purposes. Works are not dredging and no maintenance dredging
is required.
PO25 Disposal of dredge spoil avoids adverse impacts on AO25.1 Dredge spoil is not deposited on tidal land. Not applicable.
marine plants.
Works are not dredging.
Temporary works
PO26 Fish habitats and the fisheries resources No acceptable outcome is prescribed. Complies with PO26
they support are restored to pre-existing or
improved condition and extent when the Temporary works may include the deployment of
temporary works has ceased. sediment curtains, if they are deemed necessary and
shown to be effective to protect marine plants. These
will be monitored by the contractor and removed once
the works at the restoration site are complete. No
impact on fish habitat, marine plants or other fisheries
resources is anticipated. Any impact will result in the
removal of the sediment curtains.
PO27 Temporary works will be in place or are No acceptable outcome is prescribed. Complies with PO27
undertaken for a specified period and for the
shortest possible time. Temporary works may include the deployment of
sediment curtains, if they are deemed necessary and
shown to be effective to protect marine plants. These
will be monitored by the contractor and removed once
the works at the restoration site are complete. Any
impact course will result in their removal and remedial
actions implemented. See Project Restoration Plan,
Section 6.4 Sediment management for elaboration
PO28 A temporary structure is in place for a No acceptable outcome is prescribed. Complies with PO28
specified period and is designed to be
completely removed. Temporary works may include the deployment of
sediment curtains. If these are used, they will be
placed by the construction contractor and monitored
to avoid impact on marine plants or impediment to fish
State Development Assessment Provisions – version 2.6
State code 11: Removal, destruction or damage of marine plants Page 17 of 24