Original source · versioned page text
RFI - Bushfire Hazard Assessment and Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Bushfire Hazard Assessment and Management Plan
Performance Outcomes Acceptable Outcomes Compliance Assessment
Firebreaks and fire access tracks
PO8 Firebreaks and fire access AO8.1 Where development involves the creation of a Complies with PO8
tracks provide: new road and lots, a firebreak is provided by
Direct access to the dwelling site is provided via a driveway
providing a cleared road reserve not less than
along the eastern and northern boundary of the site to
20 metres wide and maximum gradient of
a. adequate access for Davis Road. This driveway is approximately 400m long
12.5% around the perimeter of the
fire fighting and other and is currently unsealed, but will be sealed with bitumen
subdivision, between the created lots and
emergency vehicles; in the future. The driveway follows a ridgeline through the
surrounding vegetated lands.
and property and passes through areas of intact, unmanaged
forest. The existing driveway passes through a managed
b. adequate access for OR
access corridor of around 20m wide, where understorey
the evacuation of
fuel is managed via regular slashing but canopy trees are
residents and AO8.2 Fire access tracks are provided between the
retained.
emergency created lots and surrounding vegetated land
personnel in an that:
emergency situation.
This driveway will provide for the egress of dwelling
a. have a cleared minimum width of 6 occupants in the event of an approaching bushfire, and the
metres; driveway is either flat or downhill the entire way out to
Davis Rd. The driveway surface is capable of supporting
b. have a maximum gradient of 12.5%;
Rural Fire Service 4WD vehicles, but the longitudinal
c. provide unbroken access for fire gradient of the driveway exceeds 12.5% at two locations,
fighting vehicles; which could cause issues for emergency services vehicle
d. provide passing bays and turning access uphill to the dwelling. There is a short stretch of
areas; driveway close to the property entrance that has a slope of
around 13.5%, and another short stretch of driveway just
e. are located within an access
below the dwelling site that has a slope of around 16%.
easement that is granted in favour of
PR22116_BHAMP_178 Davis Rd, Cootharaba Page 36
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.