Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Attachment 3 - Pump Station Upgrade Corrospondence

Attached to the e-mail Reconfiguring a Lot (1 lot into 19) - RAL18/0023.

of 10

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

™

rd

Noosa Shire Business Centre
Area Breakup .
7 March 2007

Flows — Assume 30 Lots/Ha & 2.70 EP per Lot
0.7.x 30 =21 Lots |
21 x 2.70 = 56.7 EP’s

TotalEP’s =345+456.7
= 401.7

Lets say 402 EP’s

Total Pump Station Flows
EP’s
Stockwell 1230
Tetrex - 402
External (Council) = 2333
Total Flows 3965

Percentage Break up for all Parties
Stockwell 31.02%
Tetrex 10.14%
External (Council) 58.84%
Percentage Break up Two Parties

Stockwell 75.37%
Tetrex 24.63%

Percentage Break up Total Land Area

Stockwell 50.77 Ha
Tetrex 27.97 Ha

Stockwell — 69.8%

Tetrex — 30.2%
PAWinWord\4000\4024\7-3-07areabreakup-notes.doc

4024

 

Page 2
Log in to download the original file

Attachment 3 - Pump Station Upgrade Corrospondence.pdf · 428 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.