Skip to the record
Accept no substitutions.

Original source · versioned page text

Attachment 3 - Pump Station Upgrade Corrospondence

Attached to the e-mail Reconfiguring a Lot (1 lot into 19) - RAL18/0023.

of 10

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

i

Noosa Shire Business Centre
Area Breakup
7 March 2007

Stockwell — Usable Land

 

 

 

 

 

 

 

 

 

Area Ha
Bl 3.7
B2 33
B3 5.3
Ei | 4.0
E2 1.5
E6 3.1
E7 3.7

 

 

 

Total Area — 24.6 Ha or 246,000m?
Flows — Assume GFA 40% of GDA
Unit = 100m? of GFA
Proposed EP per Unit ~ 1.25
246000 x (*/:9) = 98,400m (GFA)
984004, 49 = 984 units

984x125 =1,230EP’s

Tetrex — Usable Land

 

 

 

 

 

 

 

 

Area Ha
E3 19
F4 2.9
E5 2.1
Total 6.9 Ha or 69,000m”
Flows — Assume GFA 40% of GDA

Unit = 100m? of GFA
Proposed EP per Unit — 1.25

 

 

69000 x (/400) =27,600m? (GFA)
77890 = 276 units

276 x 1.25 = 345 EP's

Area Ha

Res 0.7

 

 

 

 

4024

 

 

Page 1
Log in to download the original file

Attachment 3 - Pump Station Upgrade Corrospondence.pdf · 428 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.