Attachment 3 - Pump Station Upgrade Corrospondence
Attached to the e-mail Reconfiguring a Lot (1 lot into 19) - RAL18/0023.
i Noosa Shire Business Centre Area Breakup 7 March 2007 Stockwell — Usable Land Area Ha Bl 3.7 B2 33 B3 5.3 Ei | 4.0 E2 1.5 E6 3.1 E7 3.7 Total Area — 24.6 Ha or 246,000m? Flows — Assume GFA 40% of GDA Unit = 100m? of GFA Proposed EP per Unit ~ 1.25 246000 x (*/:9) = 98,400m (GFA) 984004, 49 = 984 units 984x125 =1,230EP’s Tetrex — Usable Land Area Ha E3 19 F4 2.9 E5 2.1 Total 6.9 Ha or 69,000m” Flows — Assume GFA 40% of GDA Unit = 100m? of GFA Proposed EP per Unit — 1.25 69000 x (/400) =27,600m? (GFA) 77890 = 276 units 276 x 1.25 = 345 EP's Area Ha Res 0.7 4024 Page 1