Skip to the record
Accept no substitutions.

Original source · versioned page text

Attachment 3 - Pump Station Upgrade Corrospondence

Attached to the e-mail Reconfiguring a Lot (1 lot into 19) - RAL18/0023.

of 10

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

“SY

 

 

telephoning or callin: lease as] olf ECEIVE!
NOO ; f Jelf Steel (S440 m » MAR 20"

   

Your Ref:
Email: [email protected]

19 March 2007

Stockwell Pty Ltd
PO Box 3144
SOUTH BRISBANE QLD 4101

Dear Leanne,

RE: NOOSA CIVIC - REQUEST FOR CONTRIBUTION TO COSTS. OF PUMP
STATION UPGRADE

I refer to your letters of 13 March 2007 and 22 February 2007 and advise that Council
has considered its position and is not prepared to reimburse Stockwells for the:cost of
works on the new pump station.

The position has been determined on the basis that:-

1. MCU conditions which state that the applicant must upgrade the existing sewer
pump station to Noosa Shire Council Standards and requirements.

2. Operational Works Decision Notice which details approved drawings and extent
of works to be undertaken by the Applicant and its Agents and Contractors.

3. Stockwell letter of 16 May 2006 which clearly states that they do not seek any
monetary contributions from Council in relation to this upgrade.

4. In respect to the upgrading of the existing pump station, Council’s requirements
as stipulated in Noosa Shire Council’s Planning Scheme Policy 6 - Engineering
Design Standards, Water Supply and Sewerage, clearly show that the existing
pump station would require upgrading to the same extent due to additional
loadings from the Noosa Civic site irregardless of any further additional flows
from the adjacent Tetrex site i.e. Clause 5.3.3.4 states that “where loading exceeds
800 Equivalent Tenements (ET) a single pump well with a minimum diameter of
3.2m shall be provided. The pump well shall be divided by an internal diaphragm
wall which effectively isolates the two wells and allows pump isolation”.

In this regard it is noted that Council has already modified its requirements by allowing
existing pump well to be utilised, rather than requiring a completely new system to be
constructed, which has by the Applicant’s own Consultants figures, saved considerable
expense being incurred by the Applicant.

NOOSA COUNCIL ABN 97 969 214 121

9 Pelican Street Tewantin. PO Box 141 Tewantin Q 4565

Phone: 07 5449 5200 Fax: 07 5447 1062
Email: [email protected]
Log in to download the original file

Attachment 3 - Pump Station Upgrade Corrospondence.pdf · 428 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.