The report has reviewed the pre and post development scenario for the subject and external catchment
hydrology to ensure non-actionable nuisance of flows.
In summary, the development on the subject site will result in non-actionable nuisance of stormwater runoff
quantities with all runoff to outlet to infiltration tanks (both new and existing). It is expected the proposed
tank would be suitable for detention as a stand-alone system, however the connection to the historical
infiltration would provide supplementary capacity.
While a pipe connection to the existing council infrastructure in David Low Way was investigated, it was found
to be unfeasible. Substantial fill to achieve fall as well as the distance of any infrastructure from the site; this
connection cannot be considered a realistic outcome.
It is anticipated the report, when reviewed in conjunction with the planning report and the development plans;
will assist in supporting the application seeking development approval.
Yours Faithfully,
GLENN AINSWORTH
MIEAust CPEng NER RPEQ CPESC
BAX ENGINEERING PTY. LTD.
Ph: 0407 021 300
Page 10 of 11
2261 david low way, peregian beach, qld 4573 acn: 626 671 092 [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.