Skip to the record
The gold standard in government transparency.

Original source · versioned page text

RFI - C - Site Based Stormwater Management Plan

of 44

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
         DRAINAGE AND EXISTING TOPOGRAPHY

             Lawful Point of Discharge

The site drains with a grade towards an existing low point at approximately RL 10.5m AHD in the south-west
corner. This location has been the historical point of discharge and will remain.
To attempt to achieve a lawful point of discharge to the David Low Way road reserve would require substantial
fill to the site and create a visual appearance that would not be welcome to the environment.



             External Catchment and Overland Flows

In general, the site experiences no overland flow from any upper catchments.



             Stormwater Infrastructure

The proposed stormwater system utilises 150 and 225mm diameter pipes and will ultimately discharge to the
existing infiltration system via the proposed infiltration system. Overland flows from any major storm events
will also be directed towards the south-west. However, with the tank sizing available it is expected that runoff
would be reduced.



             Flooding

Flood mapping courtesy of the Noosa Council (ARCGIS Web Map) indicates the site is not subject to flooding
from any sources.
The mapping demonstrates all defined flood extents limited to the parkland in the west.




                                              Page 9 of 11
   2261 david low way, peregian beach, qld 4573      acn: 626 671 092               [email protected]
Log in to download the original file

RFI - C - Site Based Stormwater Management Plan.pdf · 6.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.