RFI - C - Site Based Stormwater Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnLIST OF FIGURES
Figure 1 - Locality Plan ......................................................................................................................................... 6
LIST OF TABLES
Table 1 – Required Infiltration Tank Volumes ..................................................................................................... 7
Table 2 – Required Infiltration Tank Size ............................................................................................................. 8
LIST OF APPENDICES
Appendix A Engineering Plans
Prepared by Bax Engineering dated February 2022
Appendix B Insite Integrated Water Management
Prepared by Bax Engineering dated February 2022
Page 3 of 11
2261 david low way, peregian beach, qld 4573 acn: 626 671 092 [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.