Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

RFI - C - Site Based Stormwater Management Plan

of 44

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Building Occupancy Calculations
Building Spaces
•253m2 of Individual dwellings - BCA Class 1a with an average occupancy of 5.1 people




 Estimated Total Building Occupancy          5.1

Stormwater VOLUME Calculations
 Site Area (m2)                              582
 Post development total impervious
 area (m2)                                   376.0
 Rainwater Tank Overflow (kL/annum)          0.0
 Pre-development Volume (kL/annum)           183.5
 Post-development Volume
                                             19.1
 (kL/annum)
 Change in volume %                          -89.6


Stormwater QUALITY Calculations
 Rainwater Tank Runoff reduction (%)         0.0
 Rainwater Tank(s) Total Nitrogen (TN)       0.0
 reduction
 Total Nitrogen (TN) % reduction             93.6
 Equivalent STORM Score                      208



Water EFFICIENCY Calculations
 Benchmark water use (kL/year)               444.9
 Predicted potable water use (kL/year)       396.0
 Predicted potable water use
                                             212.7
 (L/person/day)
 Water savings from tank (kL/year)           0.0
 Water saving from efficiency (kL/year)      48.90
                                                                                           Water
 Total water saving % (efficiency + tank     11.0                                          saving   48.9
 + recycled water)                                                                      (kL/year)




                                                                     © 2020 InSite Water www.insitewater.com.au
Log in to download the original file

RFI - C - Site Based Stormwater Management Plan.pdf · 6.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.