RFI - C - Site Based Stormwater Management Plan

of 44

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Stormwater FLOW Calculations - Boyd's formula
This section outlines rational method calculations for On Site Detention (OSD) and Site Storage Requirements (SSR)
Permissible Site Discharge (PSD) Calculations
 Calculated PSD                              20.5
 PSD Override Value Used

Site Storage Calculations
 Preliminary On Site Detention (OSD)
 tank size required estimate (m3)            4.30                   Boyd's formula formula

 OSD and storages* provided (m3)             9.2                                      Includes storages: rainwater tank retention allowance,
                                                                            rainwater tank detention, and additional added storage volumes
 Additional detention / retention
                                             -4.9
 volume required (m3)
 Base case (pre-development) fraction
                                             0.40
 impervious (ratio)
 Base case runoff coefficient                0.82
 Post development total impervious
                                             0.0376
 area (in hectares)
 Post development fraction impervious
 (ratio)                                     0.65

 Post development runoff coefficient         0.868
 Pre-development design storm                20% AEP (~1 in 5 year ARI storm) - default residential
 Post development detention required         1% AEP (~1 in 100 ARI)
 Critical Storm Duration - the
 Catchment time of concentration –           10
 Tc(catchment) in minutes
 Rainfall Depth (mm) for Critical Storm
                                             25.71
 Duration - Tc(catchment)
 Rainfall intensity - i at Tc(catchment)
                                             154.3
 (mm/h)
 Travel time from discharge point            5.0
 to catchment outlet (min) - Tcs
 Rainfall Depth (mm) for Tcs - (IFD at       18.74
 Tcs)
 Rainfall intensity - i at tc(site) (mm/h)   224.88

 OSD tank flow restrictor orifice diameter = 99 mm




                                                                   © 2020 InSite Water www.insitewater.com.au
Log in to download the original file

RFI - C - Site Based Stormwater Management Plan.pdf · 6.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.