RFI - C - Site Based Stormwater Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnThe dimensions of the proposed infiltration system would use Atlantis Flo-Tank (Matrix Triple Modules) or an
approved equivalent. The dimension of each Atlantis cell used is 408mm wide x 685mm long x 1310mm high
(0.366m3 per cell). Based on a system comprising of 25 modules connected in 5 rows of 5 modules formation,
the results for infiltration are shown in Table 2.
Table 2 – Required Infiltration Tank Size
Required Volume Proposed Tank Properties (25 modules)
Acceptable Capacity
(Hydrological Effectiveness Method) Surface Area Volume
5.82m3 6.987m2 9.15m3 Yes
It is noted that the proposed tank size well exceeds the required volume. However, based on the suitable space
for installation, this configuration has been adopted. This conservative volume as well as the unknown capacity
of the existing infiltration system that is historically being used, surpasses the requirements for non-worsening
from the site.
Page 8 of 11
2261 david low way, peregian beach, qld 4573 acn: 626 671 092 [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.