Decision Notice - Approved by Delegation of Authority OPW25 0059 (As Published) · OPW25/0059
9. A Construction Management Plan must be submitted to Council prior to the pre-start meeting
and must specifically address the following:
b. Traffic management during the construction phase.
c. appropriate traffic signage in accordance with the Manual of Uniform Traffic Control
Devices (MUTCD)
d. provision for safe pedestrian and vehicle access across the frontage of the site both
during works and after hours.
10. Any changes to the details associated with the supervising RPEQ or Principal Contractor
during construction, must be notified to council in writing within five business days of the
change occurring.
11. Any conflict between the development and an existing or proposed service must be referred
to the relevant service authority for determination prior to commencement of works.
DURING CONSTRUCTION
Engineering
12. The integrity and condition of any existing public or Council infrastructure and services
(above ground and/or underground) must not be adversely affected by the proposed works
13. The developer must meet any costs to repair damage to any Council asset during
construction, where damage is a result of the development works. Damage to assets must
be repaired immediately where it creates a hazard to the community. In circumstances where
the damage does not create a hazard to the community, it must be repaired immediately on
completion of the works associated with the development.
14. All works must be constructed and work procedure undertaken in accordance with:
a. the approved plans/documents and conditions detailed in this Decision Notice
b. all relevant Noosa Council Planning Scheme Policies, standard drawings, standard
specifications and guidelines
c. the latest version of the Healthy Waterways document “Water Sensitive Urban Design
Technical Design Guidelines for South East Queensland” for all water quality devices
to be constructed on site.
Works within Road Reserves
15. No removal of street trees is permitted without Council’s prior written approval.
16. Safe pedestrian and vehicle access on all streets in the vicinity of the development must be
maintained at all times. Should footpath/road closures be necessary to carry out construction
works, Council’s Engineering Officer must be notified prior to the proposed closure and all
requirements complied with.
17. All works must match neatly with existing road and verge/footpath features. Additional works
beyond the frontage may be required to provide an acceptable transition to existing road and
verge/footpath profiles.
Driveways
18. Driveway crossovers must be constructed generally in accordance Council’s Standard
Drawings RS-049 and RS-050
19. Any existing unnecessary or redundant property accesses must be removed, and the kerb,
footpath and verge area reinstated to match the existing footpath and/or verge treatments.
Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed
or turf, and must be maintained by the developer until established.
Page 3 of 8
Document Set ID: 23772241
Version: 0, Version Date: 01/01/1900
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Approved by Delegation of Authority OPW25 0059 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 152 KB (small file)
- File type
No other editions are linked here.