               documented in an OPW application. Hence the timing ‘prior to OPW’. I suggest the timing is not
               changed as these issues could significantly impact the ability to assess the OPW within statutory
               timeframes.
               Recommendation
               It is recommended existing condition 46 remain unchanged.


               Existing Condition 46b
               46b.    Provide sizing and nominate the locations of roofwater harvesting tanks. The tanks are to
               be sized to provide 80% reliability to supply water for landscape irrigation and flushing of toilets in
               public/communal areas of the resort.
               Applicant’s Request
               The applicant submits that given the extent of landscape works over the site, all roofwater
               harvesting tanks will be utilised to provide water for landscape irrigation, including pool top up. The
               applicant indicates that the use for flushing of toilets will necessitate double up of water supply
               lines and pumps to no benefit.
               The applicant has requested existing condition 46b be amended and replaced with the following
               amended condition:
               46b Provide sizing and nominate the locations of roofwater harvesting tanks. The tanks are to be
               sized to provide 80% reliability to supply water for landscape irrigation and flushing of toilets
               in public/communal areas of the resort pool top up.
               Assessment of Request
               The applicant’s request has been reviewed by Councils external stormwater consultant who agrees
               with the proposed change.
               Recommendation
               It is recommended existing condition 46b be amended to read as follows:
               46b Provide sizing and nominate the locations of roofwater harvesting tanks. The tanks are to be
               sized to provide 80% reliability to supply water for landscape irrigation and flushing of
               toilets in public/communal areas of the resort pool top up.



               Existing Condition 64
               64. An Acid Sulfate Soil Management Plan must be prepared and submitted with the Operational
               Works Application for the site. The Acid Sulfate Soil Management Plan must include testing,
               monitoring and treatment requirements for the works.
               Applicant’s Request
               The applicant submits that an Acid Sulfate Soil Assessment was prepared and submitted in
               response to Councils information request. The applicant further notes that the assessment
               confirmed that acid sulfate soils were not an issue and that no management measures were
               required. The report provided:




                                                                                                        Page 6 of 12

Document Set ID: 23616598
Version: 2, Version Date: 05/03/2025
Log in to download the original file

Negotiated Report (Representations made) 132008 176 05 (As Published).pdf · 371 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.