Negotiated Report (Representations made) 132008 176 05 (As Published)
documented in an OPW application. Hence the timing ‘prior to OPW’. I suggest the timing is not
changed as these issues could significantly impact the ability to assess the OPW within statutory
timeframes.
Recommendation
It is recommended existing condition 46 remain unchanged.
Existing Condition 46b
46b. Provide sizing and nominate the locations of roofwater harvesting tanks. The tanks are to
be sized to provide 80% reliability to supply water for landscape irrigation and flushing of toilets in
public/communal areas of the resort.
Applicant’s Request
The applicant submits that given the extent of landscape works over the site, all roofwater
harvesting tanks will be utilised to provide water for landscape irrigation, including pool top up. The
applicant indicates that the use for flushing of toilets will necessitate double up of water supply
lines and pumps to no benefit.
The applicant has requested existing condition 46b be amended and replaced with the following
amended condition:
46b Provide sizing and nominate the locations of roofwater harvesting tanks. The tanks are to be
sized to provide 80% reliability to supply water for landscape irrigation and flushing of toilets
in public/communal areas of the resort pool top up.
Assessment of Request
The applicant’s request has been reviewed by Councils external stormwater consultant who agrees
with the proposed change.
Recommendation
It is recommended existing condition 46b be amended to read as follows:
46b Provide sizing and nominate the locations of roofwater harvesting tanks. The tanks are to be
sized to provide 80% reliability to supply water for landscape irrigation and flushing of
toilets in public/communal areas of the resort pool top up.
Existing Condition 64
64. An Acid Sulfate Soil Management Plan must be prepared and submitted with the Operational
Works Application for the site. The Acid Sulfate Soil Management Plan must include testing,
monitoring and treatment requirements for the works.
Applicant’s Request
The applicant submits that an Acid Sulfate Soil Assessment was prepared and submitted in
response to Councils information request. The applicant further notes that the assessment
confirmed that acid sulfate soils were not an issue and that no management measures were
required. The report provided:
Page 6 of 12
Document Set ID: 23616598
Version: 2, Version Date: 05/03/2025