NOOSA COUNCIL IDAS Development Application Decision Notice                                                   5 of 8


31.    Construction work and other associated activities are permitted only during the hours of 7.00 am and 6.00
       pm Monday to Saturday. No work is permitted on Sundays or public holidays, except where extended
       hours are approved by the Manager-Land Development or his nominee.

32.    All signage, including that for safety during construction shall be in accordance with the Manual of Uniform
       Traffic Control Devices and Traffic Infrastructure (Roads) Act.

33.    Safe pedestrian access on Weyba Street shall be maintained at all times. Should footpath / road closures
       be necessary to carry out construction works, Council’s Construction Technical Officer (ph 0410 512 505)
       must be notified prior to the proposed closure.

34.    Sediment and erosion control measures must be in place prior to works commencing. If such measures
       are not in place or are not satisfactory, “on the spot “fines may be issued. Such fines can be issued if
       sediments from the site are found to enter or have the potential to enter Council’s stormwater system or
       natural waterways. Although the sediment and erosion control measures have been approved on drawing
       No 16078-OW1B dated 4 July 2007 by SCG Consulting Engineers, Council’s Manager – Land
       Development may request further controls to be installed should approved measures be inefficient.

35.    A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will be imposed
       on construction works during the maintenance period, which is a minimum period of 12 months duration.
       Such bond must be lodged by, and shall only be accepted from the Developer for the works.

36.    The works to become Council assets will not be accepted "On Maintenance" until the landscaping is
       completed.

37.    These works are also to be in compliance with the relevant conditions of Development Permit No.
       2006/138.

38.    Notwithstanding that Council has checked the plans with due care, where it is found during construction
       that variations from Council's standards exist, then Council standards shall apply




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@3001d0f4\@[email protected]

Used in these records

About this file

File size
33 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015CE09.001.pdf · 33 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.