NOOSA COUNCIL IDAS Development Application Decision Notice                                                     4 of 8


18.    A bikeway/footpath 1.5 metres wide shall be constructed across the full frontage of the development. The
       footpath shall have a slip resistant surface. The alignment, of which, shall be determined on site with
       Council’s Construction Technical Officer. The expansion joints in any bikeway/footpath shall be “sawcut”
       not trowel jointed.

19.    To ensure Council’s sewer main is accessible for maintenance purposes and is protected from risk of
       damage no structures requiring a building permit (eg. buildings, swimming pools, dividing walls exceeding
       1m in height, raised terraces, etc) shall be constructed within this ‘zone of influence’ or within 1.5m of the
       centreline of the sewer main, whichever is the greater. In this regard the existing sewer main that
       traverses the site at the rear and the ‘zone of influence’ (taken as the area within a 45-degree angle
       measured from the invert of the sewer main to the finished surface level) shall be accurately located,
       determined and marked on site by a Licensed Surveyor prior to the commencement of any works.

20.    Suitable root barrier shall be installed where proposed trees are adjacent to paths, pavement etc in
       accordance with Council’s Planning Scheme Policy PSP03 Landscaping Plants and Guidelines.

21.    The turning areas located on either side of the access driveway shall be suitably sign posted to indicate
       that the area is a “Turning Area Only” and that “No Parking is Permitted”.

22.    Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily installed into the
       first existing external downstream stormwater structure.
       These devices are to be checked and cleaned on a regular basis and specifically after each rain event.
       These devices are to remain in place during the civil works and construction phases of the development.
       The location and type of device to be installed shall be established at the “pre start” meeting with
       Council’s Construction Technical Officer and shall be installed prior to the commencement of any works.
23.    Council’s Construction Technical Officer (ph 0410 512 505), shall be given seven (7) days’ notice of
       intention to commence works to arrange a “pre start” meeting regarding the civil works.

24.    The principal contractor must have all the appropriate insurance and public liability documentation to carry
       out the works. The principal contractor is also responsible to ensure that any sub contractors also have
       the appropriate insurance and public liability documentation.

25.    Prior to the “pre start” meeting, the principal contractor must be provided with a copy of Council’s
       signed approved drawings and conditions by the applicant.

26.    The Consulting Engineers for the project shall be currently Registered Professional Engineers of
       Queensland (RPEQ). The consulting engineers are responsible for arranging all inspections, with
       Council’s Construction Technical Officer or nominated staff.

27.    Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the project.
       (This person will be the contact for the project).

28.    Council standards shall apply to these works unless otherwise modified herein.

29.    The person acting on this permit shall ensure that its consultants and contractors take all reasonable care
       during the construction of the engineering works to ensure that Council property, road pavements or
       facilities (such as underground drainage, water supply, sewerage, footpaths, kerbing, landscaping, street
       furniture etc.) are protected against any damage or interference whatsoever.

       If any Council property or facilities should be damaged by the Applicant or any of its Consultants or
       Contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the
       engineering works, the Applicant and/or its Contractors shall forthwith notify the Manager Land
       Development and shall forthwith rectify the damage to that property or facility at its cost and to the
       satisfaction of the Manager Land Development.

       All rectification works are to be completed prior to the commencement of the use or, alternatively, the
       Applicant may request the Council to carry out the rectification work at the Applicant’s cost, such cost
       being paid by the Applicant to the Council prior to the commencement of the use.

       In the case of any emergency the Council shall be entitled to rectify such damage at the cost of the
       Applicant, such cost being paid prior to the commencement of the use.

30.    The development of the site shall be carried out in such a manner as to prevent dust and/or sand
       nuisance to residents and/or tenants in the vicinity of the development.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@3001d0f4\@[email protected]

Used in these records

About this file

File size
33 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015CE09.001.pdf · 33 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.