Minor Change Report REC14/0005.05 {As Published}
A request to extend the currency period to REC14/0005 was lodged with council on 18 June 2024. The applicant was seeking an additional five (5) years to the currency, seeking a new currency period end date of 25 September 2029, noting that the current currency period is due to expire on 25 September 2024. As a result of this request, Council requested the applicant to lodge a minor change to the existing approval to amend existing conditions relating to frontage works and stormwater, to align with condition on the recent Bunnings Warehouse approval (MCU22/0051) over proposed Lot 103. The proposed changes to the conditions align with Conditions 22, 28, 29 and 30 of MCU22/0051. The application has been reviewed by Council’s Coordinator Engineering, Development Assessment who has raised no concerns with the proposed changes. The proposed changes are therefore recommended for approval. 4. CONSULTATION 4.1. Referral Agencies Not applicable 4.2. Internal Council Referrals The application was forwarded to the following internal Council officers for review and/or comment: • Coordinator Engineering, Development Assessment 5. CONCLUSION & REASONS FOR DECISION The proposed development generally complies with the requirements of the planning scheme and does not raise any significant issues that cannot be addressed by reasonable and relevant conditions. The application is therefore recommended for approval. The report is provided in accordance with Section 83(9) of the Planning Act 2016. RECOMMENDATION With regard to Application No. REC14/0005.05 to make a minor change to an existing approval for a Development Permit to Reconfigure a Lot (1 Lot into 2 Lots) situated at 178 Eumundi Noosa Rd, Noosaville Qld 4566 and described as Lot 101 SP 279285, Council on 28th October 2024 decided to: A. Approve the change. B. Amend conditions 7, 8 and 9 to read as follows: 7. Gateway Drive must be upgraded for the length of its frontage to the subject site. The works must be undertaken in accordance with an Operational Works approval, the approved plans of development and must include in particular: a. A road reserve dedication in favour of Council, maintaining a minimum verge width of 5m along the development frontage. b. Modification of the existing pavement marking to extend the channelised right turn lane (CHR). c. Extension of the existing yellow line marking “No Stopping” zone. d. Construction of a pedestrian footpath in accordance with the conditions of this Decision Notice. Condition 7 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk infrastructure. 8. Pedestrian and bicycle facilities must be provided for the development. The works must be undertaken in accordance with an Operational Works approval and must include in particular: Page 5 of 6 Document Set ID: 23255261 Version: 3, Version Date: 29/10/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Report REC14/0005.05 {As Published}Related documentApplication case desk ↗
About this file
- File size
- 991 KB (small file)
- File type
No other editions are linked here.