Skip to the record
Beware of cheap imitations.

Council archive · source document

Minor Change Report REC14/0005.05 {As Published}

of 6

Text shows just the words. Original shows the document exactly as it was published.

                              a.       A two metre wide concrete footpath within the road verge for the entire length of
                                       the site’s frontage to Gateway Drive and connecting to the existing path fronting
                                       Lot 11 SP170295.
                              Condition 8 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
                              infrastructure.
                      9.      The site must be provided with a stormwater drainage system connecting to a lawful
                              point of discharge. The works must be undertaken in accordance with an Operational
                              Works approval, AS3500.3 and the Queensland Urban Drainage Manual, and must
                              include in particular:
                              a.       Collection and discharge of stormwater to Council’s underground pipe network
                                       in Gateway Drive
                              b.       Extension of the site stormwater system to accommodate stormwater from the
                                       external catchment East of the site, including registration of drainage easements
                                       over the pipe network within the subject site in favour of the upstream lot.
                              c.       The retention of the existing overland flowpath that conveys stormwater runoff
                                       from the adjoining property (Lot 26 SP151406) through proposed Lot 103. The
                                       flows must be contained and conveyed wholly within a 600mm dia. underground
                                       pipe at minimum 2% grade, constructed along the southern boundary of
                                       proposed lot 103.
                              d.       Cut off drains along the Eastern site boundary to convey external catchment
                                       flows up to the 1%AEP climate change event into the pipe network within the site
               C.     Include the following additional condition 9a:
                      9a.     Carry out the development to ensure that adjoining properties, reserves and roads are
                              protected from ponding or nuisance from stormwater as a result of any works
                              undertaken.




                                                                                                           Page 6 of 6

Document Set ID: 23255261
Version: 3, Version Date: 29/10/2024

Used in these records

About this file

File size
991 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Report REC14_0005.05 {As Published}.pdf · 991 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.