Extension to Currency Period - Approved 132008.176.04 [AS PUBLISHED]

of 20

Page text shows just the words. Original shows the document exactly as it was published.

                        a.      7am to 10pm: Maximum background + 5dB(A)
                        b.      10pm to 7am: Maximum background + 3dB(A)
                        Pumps
                        a.      7am to 7pm: Maximum background + 5dB(A)
                        b.      7pm to 10pm: Maximum background + 3dB(A)
                        c.      10pm to 7am: No audible noise.
                 103. Written certification from a suitably qualified person shall be submitted confirming that
                      the noise levels from all mechanical equipment comply when measured at either the
                      residential boundary or outside the most exposed part of an affected building, whichever
                      is the closest to the equipment.
                        The assessment and certification is required immediately after installation of the
                        equipment and prior to any occupation of the building, and in a format approved by
                        Council. All equipment should be operating at the same time to test the overall noise
                        level created.
                        Note: It is highly recommended that the person you engage to certify the installation is
                        involved at the plan development stage so they can recommend where this equipment
                        is best located. They can also advise about noise enclosures and can make other
                        suggestions to avoid noise problems. It is a lot more costly to try and deal with noise
                        problems after everything is built.
                 104. Noise from building works associated with residential development shall comply with the
                      following –
                        a.      Limited to between 7:00am to 6:30pm Monday to Saturday.
                        b.      All reasonable measures are taken to minimise noise emissions.
                        c.      Not permitted on Sunday or public holidays.
                        Communication with existing residents
                 105. The developer shall institute a fortnightly communication with residents within Serenity
                      Close to advise of construction progress and works to be undertaken in the coming
                      fortnight.
                        Additional Condition July 2013 – Koala Off-set Contribution
                 106. A monetary contribution of $44,160 ($920 x 48 trees) must be made to Council for the
                      off-set of 48 koala habitat trees in accordance with the Policy for Offsets for New Gain
                      of Koala Habitat in South East Queensland. The monetary contribution must be paid
                      within 12 months of this approval taking effect pursuant to the Offsets for Net Gain of
                      Koala Habitat in South East Queensland




Document Set ID: 23307313
Version: 3, Version Date: 24/10/2024                                                                  Page 15 of 20
Log in to download the original file

Extension to Currency Period - Approved 132008.176.04 [AS PUBLISHED].pdf · 225 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.