Extension to Currency Period - Approved 132008.176.04 [AS PUBLISHED]
a. 7am to 10pm: Maximum background + 5dB(A)
b. 10pm to 7am: Maximum background + 3dB(A)
Pumps
a. 7am to 7pm: Maximum background + 5dB(A)
b. 7pm to 10pm: Maximum background + 3dB(A)
c. 10pm to 7am: No audible noise.
103. Written certification from a suitably qualified person shall be submitted confirming that
the noise levels from all mechanical equipment comply when measured at either the
residential boundary or outside the most exposed part of an affected building, whichever
is the closest to the equipment.
The assessment and certification is required immediately after installation of the
equipment and prior to any occupation of the building, and in a format approved by
Council. All equipment should be operating at the same time to test the overall noise
level created.
Note: It is highly recommended that the person you engage to certify the installation is
involved at the plan development stage so they can recommend where this equipment
is best located. They can also advise about noise enclosures and can make other
suggestions to avoid noise problems. It is a lot more costly to try and deal with noise
problems after everything is built.
104. Noise from building works associated with residential development shall comply with the
following –
a. Limited to between 7:00am to 6:30pm Monday to Saturday.
b. All reasonable measures are taken to minimise noise emissions.
c. Not permitted on Sunday or public holidays.
Communication with existing residents
105. The developer shall institute a fortnightly communication with residents within Serenity
Close to advise of construction progress and works to be undertaken in the coming
fortnight.
Additional Condition July 2013 – Koala Off-set Contribution
106. A monetary contribution of $44,160 ($920 x 48 trees) must be made to Council for the
off-set of 48 koala habitat trees in accordance with the Policy for Offsets for New Gain
of Koala Habitat in South East Queensland. The monetary contribution must be paid
within 12 months of this approval taking effect pursuant to the Offsets for Net Gain of
Koala Habitat in South East Queensland
Document Set ID: 23307313
Version: 3, Version Date: 24/10/2024 Page 15 of 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.