Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Extension to Currency Period - Approved 132008.176.04 [AS PUBLISHED]

of 20

Page text shows just the words. Original shows the document exactly as it was published.

                        b.      A waste management table as indicated below is to be completed showing how
                                waste material is to be segregated - recycled – reused or disposed.

                         MATERIALS ON-SITE               DESTINATION

                                                         Re-use and Recycling                  Disposal

                         Expected waste      Estimated On-site              Off-site           *specify
                         materials           volume    *specify             *specify           contractor and
                                             (m³)      proposed re-         contractor and     landfill site or
                                                       use or on-site       recycling outlet   other disposal
                                                       recycling                               site
                                                       methods

                         Excavation
                         material

                         Green waste

                         Bricks

                         Concrete

                         Timber-please
                         specify

                         Plasterboard

                         Metals - please
                         specify

                         Asbestos

                         Other - please
                         specify

                        Note * If a demolition contractor is undertaking works, then the Waste Management
                        table is to be completed by the demolition contractor.

                          The purpose of the Waste Management Plan is to facilitate the segregation of waste
                          for the effective reuse and recycling of such materials. Additionally Council rewards
                          those who segregate waste by significantly reducing disposal fees at the landfill
                          some items are free. Higher gate fees are charged for loads of mixed waste.

                        Trade Waste
                 101. The drainage system from all business that are likely to discharge trade waste must
                      comply with Council’s Trade Waste Policy and Sunshine Water’s guidelines for
                      accepting trade waste into the sewer. All appropriate trade waste permit and/or
                      agreements must be applied for and issued prior to the discharge of any trade waste to
                      the sewer.
                 102. Noise emission from mechanical equipment shall comply with the following
                      requirements:
                        Air-conditioning and Refrigeration




Document Set ID: 23307313
Version: 3, Version Date: 24/10/2024                                                                   Page 14 of 20
Log in to download the original file

Extension to Currency Period - Approved 132008.176.04 [AS PUBLISHED].pdf · 225 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.