Extension to Currency Period - Approved 132008.176.04 [AS PUBLISHED]

of 20

Page text shows just the words. Original shows the document exactly as it was published.

                        approval and any drainage required to drain these areas shall also be shown on the
                        plans.
                        Roadworks
                 54.    All modifications to the existing median necessitated by the development shall be
                        designed and constructed in accordance with Council’s Planning Scheme Policy 5 –
                        Engineering Design Standards – Roads, Drainage and Earthworks.
                        In this regard a schedule of works, specifications and plans detailing this work shall be
                        prepared and submitted to Council for approval prior to obtaining a Development Permit
                        for Operational Works.
                        Frontage Works
                 55.    Footpath improvements such as topsoiling, grassing, and tree planting are required to
                        the Serenity Close and Banksia Place frontages of the site in accordance with Planning
                        Scheme Policy PSP03 Landscaping Plants & Guidelines. Grass shall be couch, free of
                        weeds.
                 56.    All redundant vehicular crossings to the site shall be removed and replaced by kerb &
                        channel, footpath paving and landscaping such as trees and grasses in accordance with
                        Council’s Standard specifications prior to commencement of the use permitted by this
                        permit.
                        Roof Water & Stormwater Drainage
                 57.    Roof runoff from any new building shall be directed to a rainwater storage system or
                        tank that is installed to ensure water from the rainwater storage system or tank is used
                        for external uses (such as watering gardens, irrigation, ornamental ponds, water
                        features, topping-up swimming pools, outdoor cleaning, etc) and for internal (ground
                        floor) use in washing machine cold taps and toilet cisterns. All rainwater tanks are to be
                        designed and installed in accordance with the Queensland Development Code (QDC)
                        current at the time of building approval, and shall be part of the plumbing application for
                        approval. The location and capacity of the tanks shall be clearly shown on the plans
                        submitted for Building Works/Operational Works approval and any overflow shall be
                        directed to the stormwater drainage system.
                 58.    A stormwater management plan and stormwater management design must be submitted
                        to Council for approval prior to obtaining a Development Permit for Operational Works.
                        The stormwater management plan and stormwater management design must be
                        prepared by a RPEQ, specialising in stormwater and water quality management
                        incorporating the principles of the relevant approved Management Plans as described
                        in Decision Notice 23118 DA. The stormwater management plan and stormwater
                        management design must demonstrate water reuse strategies, infrastructure capacity
                        and effective treatment methodology. The use of rainwater harvesting tanks for irrigation
                        purposes shall be incorporated in the overall design plans. The following information is
                        required to be submitted with the stormwater management plan and stormwater
                        management design submitted with the application for Operational Works Approval:
                        a.      An Audit report which confirms that the stormwater design achieves all criteria and
                                actions specified in Elements D.1 of Settlers Cove Noosa Residential High Density
                                Environmental Management Plan by WBM dated 25 July 2007;
                        b.      Confirmation from an RPEQ that the sites proposed stormwater management
                                measures will provide for infiltration into the sand subgrade without runoff for
                                storms up to a 10 year Average Recurrence Interval;
                        c.      The location for any required oil and sediment traps; &




Document Set ID: 23307313
Version: 3, Version Date: 24/10/2024                                                                     Page 8 of 20
Log in to download the original file

Extension to Currency Period - Approved 132008.176.04 [AS PUBLISHED].pdf · 225 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.