Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2019-02-12 Planning & Environment Committee Agenda

of 94

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               12 FEBRUARY 2019


    37.   Where the development involves changes to the existing levels over, or adjacent to,
          drainage, water supply or sewerage infrastructure, all access chamber surface levels
          must be adjusted to provide a freeboard of 100mm above the finished ground surface
          level or as required by the service provider and/or the approved plans for Operational
          Works.
    38.   All retaining walls and stormwater headwalls must be designed and constructed in
          accordance with the planning scheme and must be certified by an RPEQ where
          exceeding 1.0m in height. All retaining walls that are publicly accessible and exceed
          1.0m in height must be fitted with a commercial grade safety fence.
          Erosion and Sediment Control
    39.   Any person acting on this permit shall prevent erosion and sediment export from
          leaving the site. Site control measures such as silt fencing, controlled gravel access to
          the site and controlled disposal of waste, will be necessary.
          In this regard plans prepared by suitably qualified person detailing the methods and
          measures of controlling erosion and sediment are required to be submitted to the
          Council in conjunction with an application for the Development Permit for Operational
          Works.
          Electricity and Telecommunication Services
    40.   Underground reticulated electricity and telecommunication services must be provided
          to the development site in accordance with an approval for Operational Works and be
          in compliance with the standards and requirements of the relevant service provider.
    41.   Unless otherwise stipulated by telecommunications legislation at the time of
          construction, the development must be provided with all necessary conduits, pits and
          pipes to accommodate the future connection of optic fibre technology
          telecommunications.
    42.   Certification must be submitted to Council from all relevant service providers which
          certifies that the development has met the requirements of this Decision Notice and all
          applicable legislation at the time of construction.
    43.   Conduits for electrical power or other services and connections proposed to be
          installed within existing and proposed road reserves under existing sealed
          carriageways, concrete pathways, concrete/sealed driveways or vegetation identified
          for retention must be installed by boring. Trenching is not permitted, unless specifically
          approved by Council.
          General - Engineering
    44.   A suitably qualified Registered Professional Engineer shall prepare engineering
          drawings and specifications for all engineering works that will become Council
          infrastructure, which shall be submitted in conjunction with an application for a
          Development Permit for Operational Works. To avoid conflict with underground pipes
          or services, all existing and proposed services required by the development shall be
          shown on the plans.
    45.   Any alteration of any public utility or other facilities necessitated by the development of
          the land or associated construction works external to the site shall be at no cost to
          Council.




                                                                                     Page 19 of 94
Log in to download the original file

2019-02-12 Planning & Environment Committee Agenda(PDF, 14MB).pdf · 14.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.