PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 12 FEBRUARY 2019
37. Where the development involves changes to the existing levels over, or adjacent to,
drainage, water supply or sewerage infrastructure, all access chamber surface levels
must be adjusted to provide a freeboard of 100mm above the finished ground surface
level or as required by the service provider and/or the approved plans for Operational
Works.
38. All retaining walls and stormwater headwalls must be designed and constructed in
accordance with the planning scheme and must be certified by an RPEQ where
exceeding 1.0m in height. All retaining walls that are publicly accessible and exceed
1.0m in height must be fitted with a commercial grade safety fence.
Erosion and Sediment Control
39. Any person acting on this permit shall prevent erosion and sediment export from
leaving the site. Site control measures such as silt fencing, controlled gravel access to
the site and controlled disposal of waste, will be necessary.
In this regard plans prepared by suitably qualified person detailing the methods and
measures of controlling erosion and sediment are required to be submitted to the
Council in conjunction with an application for the Development Permit for Operational
Works.
Electricity and Telecommunication Services
40. Underground reticulated electricity and telecommunication services must be provided
to the development site in accordance with an approval for Operational Works and be
in compliance with the standards and requirements of the relevant service provider.
41. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
42. Certification must be submitted to Council from all relevant service providers which
certifies that the development has met the requirements of this Decision Notice and all
applicable legislation at the time of construction.
43. Conduits for electrical power or other services and connections proposed to be
installed within existing and proposed road reserves under existing sealed
carriageways, concrete pathways, concrete/sealed driveways or vegetation identified
for retention must be installed by boring. Trenching is not permitted, unless specifically
approved by Council.
General - Engineering
44. A suitably qualified Registered Professional Engineer shall prepare engineering
drawings and specifications for all engineering works that will become Council
infrastructure, which shall be submitted in conjunction with an application for a
Development Permit for Operational Works. To avoid conflict with underground pipes
or services, all existing and proposed services required by the development shall be
shown on the plans.
45. Any alteration of any public utility or other facilities necessitated by the development of
the land or associated construction works external to the site shall be at no cost to
Council.
Page 19 of 94
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.