2019-02-12 Planning & Environment Committee Agenda

of 94

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               12 FEBRUARY 2019


          Stormwater Drainage
    28.   The site must be provided with a stormwater drainage system connecting to a lawful
          point of discharge. The works must be undertaken in accordance with an Operational
          Works approval and the Queensland Urban Drainage Manual (QUDM) and the design
          be prepared and certified by a Registered Professional Civil Engineer, and must
          include/address in particular the following:
          a.    Collection and discharge of stormwater to Council’s existing drainage system in
                Kauri Street generally in accordance with Drawing No 2018068-P01 dated
                12/09/2018 by 360 Civil Consulting and including the provision of any required
                inter-allotment drainage within the site.
          b.    Shall be no net increase in stormwater runoff from the current undeveloped
                condition of the site.
          c.    Where applicable, extension of the site stormwater system to accommodate
                stormwater from external adjoining properties, including registration of drainage
                easements.
          d.    The use of gravity stormwater drainage and not surcharge pits.
    29.   A CCTV inspection must be carried out by a Council approved CCTV contractor upon
          satisfactory completion of construction works. The developer will be responsible for the
          full cost of CCTV inspection, including any additional inspection necessary following
          defect identification and rectification.
          Easements
    30.   Unless otherwise agreed in writing by the relevant service provider, any public or third
          party infrastructure located on the subject site must be placed within an easement
          registered against the title of the property.
    31.   All easements must be designed in accordance with the planning scheme and granted
          at no cost to the Grantee. Where the Grantee is Council or a service authority, the
          easement documentation must be in accordance with the Grantee’s standard
          easement terms. Draft easement documentation must be submitted to Council for
          endorsement.
    32.   All works must be kept clear of any existing or proposed easements on the subject
          land, unless agreed otherwise in writing by the Grantee.
          Earthworks
    33.   All earthworks must be undertaken in accordance with a development permit for
          Operational Works and in compliance with the provisions of AS 3798: Guidelines on
          Earthworks for Commercial and Residential Development, with geotechnical testing
          undertaken in accordance with Section 8 of the Standard, and to a minimum of ‘Level
          2’ supervision Test results as required by AS 3798 and/or the directions of the
          supervising engineer. A certification of the earthworks must be provided by a RPEQ
          and submitted to Council prior to the final inspection of the completed works by Council.
    34.   Earthworks works required on site must be carried out so as not to cause the additional
          ponding of water on any adjoining lands or the blockage of, or interference with, any
          natural watercourses.
    35.   Earthworks carried out on site shall not affect the structural integrity of any of the
          existing fences and/or structures and/or lands that border the development site. Fences
          that are affected shall be replaced prior to the Building Certifier issuing the Certificate
          of Classification. In this regard any fences to be replaced shall be clearly shown on the
          plans submitted for Operational Works approval.
    36.   All earthworks and any associated batters must be contained entirely within the subject
          site unless written permission from the respective landowner(s) is provided to Council.
                                                                                     Page 18 of 94
Log in to download the original file

2019-02-12 Planning & Environment Committee Agenda(PDF, 14MB).pdf · 14.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.