PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 12 FEBRUARY 2019
Stormwater Drainage
28. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval and the Queensland Urban Drainage Manual (QUDM) and the design
be prepared and certified by a Registered Professional Civil Engineer, and must
include/address in particular the following:
a. Collection and discharge of stormwater to Council’s existing drainage system in
Kauri Street generally in accordance with Drawing No 2018068-P01 dated
12/09/2018 by 360 Civil Consulting and including the provision of any required
inter-allotment drainage within the site.
b. Shall be no net increase in stormwater runoff from the current undeveloped
condition of the site.
c. Where applicable, extension of the site stormwater system to accommodate
stormwater from external adjoining properties, including registration of drainage
easements.
d. The use of gravity stormwater drainage and not surcharge pits.
29. A CCTV inspection must be carried out by a Council approved CCTV contractor upon
satisfactory completion of construction works. The developer will be responsible for the
full cost of CCTV inspection, including any additional inspection necessary following
defect identification and rectification.
Easements
30. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
31. All easements must be designed in accordance with the planning scheme and granted
at no cost to the Grantee. Where the Grantee is Council or a service authority, the
easement documentation must be in accordance with the Grantee’s standard
easement terms. Draft easement documentation must be submitted to Council for
endorsement.
32. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Earthworks
33. All earthworks must be undertaken in accordance with a development permit for
Operational Works and in compliance with the provisions of AS 3798: Guidelines on
Earthworks for Commercial and Residential Development, with geotechnical testing
undertaken in accordance with Section 8 of the Standard, and to a minimum of ‘Level
2’ supervision Test results as required by AS 3798 and/or the directions of the
supervising engineer. A certification of the earthworks must be provided by a RPEQ
and submitted to Council prior to the final inspection of the completed works by Council.
34. Earthworks works required on site must be carried out so as not to cause the additional
ponding of water on any adjoining lands or the blockage of, or interference with, any
natural watercourses.
35. Earthworks carried out on site shall not affect the structural integrity of any of the
existing fences and/or structures and/or lands that border the development site. Fences
that are affected shall be replaced prior to the Building Certifier issuing the Certificate
of Classification. In this regard any fences to be replaced shall be clearly shown on the
plans submitted for Operational Works approval.
36. All earthworks and any associated batters must be contained entirely within the subject
site unless written permission from the respective landowner(s) is provided to Council.
Page 18 of 94
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.