PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 12 FEBRUARY 2019
The following actions have been undertaken in accordance with the decision making framework:
Avoid – Staff are encouraged to turn off all equipment when not in use.
Reduce – Council has been implementing energy efficiency measures such as changes to LED
lighting, upgrading air conditioning and changing pool cars to energy efficient small
hybrid sedans.
Change - Council has installed over 270 Kilowatts of rooftop solar PV on Council buildings. The
reduction in electricity consumption from the grid has been significant, as discussed
above.
Offset – To date, Council has focussed on reducing emissions at the source and will consider
options for dealing with residual emissions such as sequestration and offsetting in the
future.
Key Action 4: A detailed Action Plan will be developed that will prioritise actions over
an initial 5-year period (and ultimately 10 years). Funding of actions will
be considered as part of the annual budget development process.
Given the changing nature of technologies and approaches to energy reduction, an initial 3 year
action plan was developed.
An audit undertaken of Council buildings and facilities identified over 40 potential projects which
Council could undertake to reduce its emissions. Council developed a Marginal Abatement Cost
Curve (MACC) to compare potential energy efficiency and carbon reductions projects and rank
them based on their economic feasibility and potential impact. The MACC is used to prioritise the
projects which will achieve the greatest emission reductions for the dollar spend.
The MACC is one of the inputs into the 3 year ZEN Action Plan approved by Council on 18th
January 2018. The following table details the status of the actions determined for the 2017/18
year.
Category Action Status Comments
Waste Conduct an audit of the waste Complete Results of the waste audit are
disposed to Council landfill to discussed above
accurately measure the % of
organic waste for emission
calculations
Waste Investigate feasibility of flared Ongoing Discussions with the LMS are
gas being used for electricity continuing to determine the
generation feasibility of electricity generation
from the landfill gas as the
methane extraction is increased
Waste Determine opportunities to Complete Lateral lines for increased landfill
increase Landfill Gas extraction gas extraction have been
in conjunction with LMS e.g. installed.
lateral extraction lines
Building & Investigate the installation of Complete Audit complete, recommendations
facilities Energy Management Systems at for EMS installation are being
relevant sites assessed as the solar installations
and monitoring are completed.
Noosaville LED lighting upgrade Complete LED lighting was retrofitted
Depot throughout the Depot offices.
Noosaville Air conditioning upgrade and Complete Ceiling insulation and a new
Depot insulation installation invertor air conditioning system
with local controls was installed.
Page 84 of 94
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.