Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2019-02-12 Planning & Environment Committee Agenda

of 94

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                              12 FEBRUARY 2019


 Category         Action                           Status         Comments
 Noosaville       Solar PV installation            Complete       50Kw of solar PV was installed.
 Depot
 Noosa Leisure    Solar PV installation            Complete       32 Kw of solar was installed.
 centre
 Noosa Aquatic    Interior LED upgrade             Complete       LEDs were installed throughout
 Centre                                                           the NAC offices
 Noosa Aquatic    Solar PV installation            Incomplete     26 Kw of PV is to be installed in
 Centre                                                           2018/19 with the remainder being
                                                                  installed when the roof is replaced
                                                                  in 2019/20.
 The J            Solar PV installation            Complete       50Kw of solar PV was installed.
 Cooroy Library   LED Upgrade                      Complete
 Cooroy Library   Air conditioning improvements    Complete      The    Building   Management
                                                                 System (BMS) was improved.
Table 3: Status of ZEN actions for 2017/18 as outlined in the Noosa Council Net Zero Emissions
Organisational Action Plan 2017-2020


Key Action 5:       The process outlined in the Strategy will be utilized when determining
                    the appropriate approach to the purchase of carbon offsets.

The decision making process for the purchase of offsets in outlined below in Figure 4.




Figure 4: Decision-making process for the purchase of offsets

To date Council has been pursuing emission reductions as outlined in Figure 1 by avoiding
emissions, reducing emissions by improving energy efficiency, changing energy to renewable
sources as shown in Table 3. The purchase of offsets is the last resort option when considering
actions to achieve net zero emissions.

Due to the legacy of landfill emissions, it is likely that Council will reach an “emissions floor”
whereby further emission reductions are not technically or economically feasible. Therefore to
achieve net zero emissions Council may need to purchase carbon offsets. During 2017/18 Council
commenced investigating the quantum of this emissions floor and the likely cost of purchasing
carbon offsets. This work is ongoing and will inform the development of an emissions offset policy.


                                                                                     Page 85 of 94
Log in to download the original file

2019-02-12 Planning & Environment Committee Agenda(PDF, 14MB).pdf · 14.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.