Original source · versioned page text
2019-02-12 Planning & Environment Committee Agenda
The original of this document is very large (14.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 12 FEBRUARY 2019
The critical time for concentration during 1% flood event is 33 minutes. This means it takes
33 minutes to reach peak depth and velocity and then gradually subsides within
approximately 60-65 minutes back to ‘dry’. Therefore, the peak (worst case) flows across the
driveway and the site are only happening for 10-15 minutes as per typical flood hydrograph
below shown as Figure 4.
Figure 4 - Hydrograph
Council’s hydrology consultant has reviewed the applicant’s Flood Hazard Assessment Report and
provides the following advice:
The flood report suggests that only 30% of the total catchment flow will drain through the site
but there is no detail of how this has been determined. A review of the LiDAR ground level
DEM of the area suggests most, if not all, of the total catchment runoff is likely to drain
through the site.
The modelling makes no allowance for fence blockages and appears to be too localised to
provide meaningful results. While I have not inspected the site, aerial imagery shows that a
tennis court is situated immediately downstream. Given the bushland catchment, there is a
high potential for a chain wire fence to become highly blocked with debris and this will
increase flood levels through the site.
No comments have been provided in regards to the flood resilience of the dwelling. It is
situated within a natural bushland flow path and it will be subject to flooding from time to time
(certainly below floor level). It would need to be demonstrated that the house is resilient to
flooding and give consideration to the high levels of natural debris that is likely to be mobilised
during a large flood.
Flood hazard risk associated with the proposed access should be assessed in more detail
and account for full catchment flows and debris.
Overall I would not support this proposal. Ultimately it will place more people within an area
which has a clear risk of flooding.
There is a discrepancy between the house extension architectural drawings by Void Building
Design and the Building Pad and Site Works Plan (ST03-1) (2) by Barlow Shelley on the
exact location of the driveway and associated culvert crossing
Flood level and velocity impact plots are required to demonstrate no significant adverse
flooding impacts will result on adjacent and downstream properties, and to demonstrate that
a lawful point of discharge will be achieved
A number of deficiencies in the information supplied to date, as well as discrepancies in this
data, have been identified.
The proposal is not consistent with the Reconfiguring a Lot Code requirements for 100% of the
allotment to be above the defined flood level of 1% AEP water surface levels, with lot 1 located
almost fully below the 1% AEP and lot 2 in part. Lot 1 clearly does not contain a suitable house
site area being subject to flooding from an overland drainage flow path.
Page 9 of 94
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.