Building Height
47. The maximum height of the development must not exceed 9 metres above the ground level.
Including where excavation is undertaken the exposed portion of the external façade of the
building.
Building Appearance
48. External design features, materials and finishes must be as shown on the Approved Plans,
with no inclusions or alterations made without approval in writing by Council.
Water & Sewer Connections
49. The development must be provided with a potable water supply having a capacity sufficient
for the use.
50. An underground connection to reticulated sewerage must be provided to the premises in
accordance with the standards and requirements of Northern SEQ Distributor–Retailer
Authority (Unitywater).
51. A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater)
must be submitted to Council that certifies an underground connection to reticulated water
and sewerage has been provided to the premises.
ECOLOGY AND ENVIRONMENT
52. A detailed offset delivery plan (ODP) must be developed generally in accordance with the
Environmental Offsets Act 2014, and Revised Determination and Location of Offset
Requirements – Site A on Lot 77 SP298776, dated 6th February 2025, prepared by Native
Foresters.
53. Certification must be submitted to Council from a qualified person* which certifies that the
subject works have been undertaken in accordance with the Offset Delivery Plan prior to the
commencement of the use of the additional area.
*(Refer to Advisory Note)
54. All recommendations outlined in Section 7.0 of the Flora and Fauna Assessment must be
fully implemented before the commencement of the new facilities. Certification prepared by
a suitably qualified person, must be provided to confirm that all works have been completed
in accordance with the Flora and Fauna Assessment.
55. Rehabilitation and weed management of the 30-metre-wide vegetation buffer area west of
the Cleanaway Depot must be undertaken generally in accordance with the
recommendations of the Revised Determination and Location of Offset Requirements – Site
A on Lot 77 SP298776 Letter.
56. Certification must be submitted to Council from a qualified person* which certifies that the
rehabilitation and weed management works have been undertaken in accordance with the
Revised Determination and Location of Offset Requirements – Site A on Lot 77 SP298776
Letter.
*(Refer to Advisory Note)
Document Set ID: 24299903
Version: 14, Version Date: 26/11/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.