2021-11-15 GC Agenda - Item 7 - Attachment 1 - Coastal Hazards Adaptation Plan
The original of this document is very large (11.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Noosa Coastal Hazards Adaptation Plan
Based on expert technical advice and feedback received through a series of community surveys and
workshops, a range of assessment criteria were applied to a list of 53 potential adaptation options for
assets and locations where risks are considered high or very high. These criteria are shown in Table 324.
The purpose of this stage of the project was to determine which of these adaptation options are likely
suitable for Noosa or which might work, but for one reason or another, require further work to determine
their feasibility. This stage also assessed those options that are very likely to be ineffective or unfeasible for
inclusion in this plan. Reference Box #3 explains how each of the options were assessed and categorised.
Criteria Criteria Description
Cost Monetary costs to build/implement an adaptation option (further detailed studies
to confirm costs may be required), either by Council or private landowners
Environmental Whether an adaptation option will have adverse impacts on environmental values
Impact e.g. Matters of State Environmental Significance
Social Impact Whether an adaptation option will have adverse impacts on other social values or
is likely to have community support e.g. access, amenity, property values
Reversible/ Whether an option is able to be ‘reversed’ or adapted to cater for future needs
adaptable
Effectiveness Whether an option is technically feasible (i.e. is effective in mitigating the risk and
is implementable)
Whether an option is able to be readily approved (i.e. is consistent with current
planning policy or legislative requirements)
Whether an option provides a long-term solution to the coastal hazard risk, or is
suitable for use as an interim option
Table 3 - Adaptation options assessment criteria
Reference Box #3
Assessing adaptation options
Using the criteria set out in Table to score each option, a “traffic light” system was then used
to group the options for deliberation as follows:
•
Proceed (‘GO’): an option is considered suitable with no other adverse impacts, and
requires no further development (i.e. studies, design, etc.). These could also be defined
as “No Regrets” options
•
Investigate Further (‘SLOW’): an option may be suitable, but should be subject to further
detailed assessment at specific locations e.g. cost-benefit analysis or lot-scale surveys
•
Unfeasible (‘STOP’): an option is not considered suitable at a location and may not be
considered for further detailed analysis.
24
For more information, see BMT (2020)’s Noosa Shire Climate Change Adaptation Plan: Options Assessment Phase 6
Page 31
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.