2021-11-15 GC Agenda - Item 7 - Attachment 1 - Coastal Hazards Adaptation Plan
The original of this document is very large (11.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Noosa Coastal Hazards Adaptation Plan
Adaptation outcomes and associated actions for Tewantin
The assessment of inundation risks to Tewantin show the level of risk across all asset types in areas
adjacent to the Noosa River will very likely become intolerable within 50 years.
Adaptation outcomes and associated actions for Tewantin
Analysis of socio-economic, environmental, and governance considerations, as well as community
The assessment
input of inundation
received throughout risks todevelopment,
the CHAP’s Tewantin show the level
indicate of riskappropriate
the most across all asset types in
adaptation
areas adjacent
pathway to the Noosa
for responding River will
to inundation veryinlikely
risks become
this locality is intolerable within 50
one that supports years.recreational
existing
and visual amenity values, as well as accessibility and infrastructure services. Therefore, the
Analysis of socio-economic, environmental, and governance considerations, as well as community
preferred adaptation outcomes for this locality are:
input received throughout the CHAP’s development, indicate the most appropriate adaptation
pathway for responding
- Implement measuresto inundation
that protectrisks in this recreational
important locality is one that stormwater
areas, supports existing recreational
network, road and
and visual amenity
footpath assetsvalues, as well as
from periodic accessibility
tidal inundation and infrastructure services. Therefore, the
preferred
- Whereadaptation
possible,outcomes
re-locate for thisrecreational
major locality are:and infrastructure assets (e.g. amenities blocks,
the Tewantin water park) outside the projected high-risk foreshore areas by 2070
- Implement measures that protect important recreational areas, stormwater network, road
- Where important
and footpath recreational
assets assetstidal
from periodic cannot be feasibly re-located, seek to accommodate the
inundation
- risks
Where possible,the
by adapting re-locate
designmajor recreational
of these andadaptive
assets (e.g. infrastructure
landscape assets (e.g. amenities
design) to be more
blocks, the Tewantin water park) outside the projected high-risk foreshore areas by 2070
resilient
- Re-design
- Where important
importantrecreational assetsservice
road and buried cannotinfrastructure
be feasibly re-located,
networks to seek to accommodate
be more resilient to
the risks by adapting the design of these assets (e.g. adaptive landscape design) to be
inundation hazards.
more resilient
-
Figure 20 Re-design
shows theimportant
expectedroad and buried
progression of service infrastructure
these preferred outcomes networks between to be2020
more andresilient
2100. to
Table 22inundation
provides ahazards.
breakdown of actions in support of these outcomes, to be pursued within the
five-year life of this plan.
Figure 20 shows the expected progression of these preferred outcomes between 2020 and 2100.
Pathways Map Legend
Table 22 provides a breakdown of actions in support of Trigger thesepoints
outcomes,
(points in time to be apursued
for when within
decision needs the
to be made)
five-year life of this plan. Commencement or future commencement of adaptation option
Active action on this adaptation pathway
Effectiveness of this option may be reduced and require reassessment
Figure 20 - Preferred long-term adaptation pathway response to projected coastal inundation risks in Tewantin
Figure 20 - Preferred long-term adaptation pathway response to projected coastal inundation risks in Tewantin
Page 71
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.