Original source · versioned page text
2021-11-15 GC Agenda - Item 7 - Attachment 1 - Coastal Hazards Adaptation Plan
The original of this document is very large (11.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Noosa Shire Council
The following actions will help progress the achievement of these outcomes:
MANAGEMENT ACTIONS FOR TEWANTIN –
RESPONSE THE NEXT 5 YEARS
AREA
Land Use Maintain land use planning approach and alignment with State Planning Policy
Planning
Public Investigate a range of backflow prevention methods and technology for
recreational, stormwater network assets identified as vulnerable
built, and Investigate location, scale and design of adaptive landscape structures
Infrastructure (e.g. non-intrusive levees, innovative design features for garden beds, public
assets furniture, park design and raised foreshore footpaths41) to prevent frequent,
shallow and low flow tidal inundation of Ward Park, RSL Memorial Park, and
Tewantin Park and adjacent parking areas.
Investigate road corridor designs that are more resilient to frequent wet/dry
scenarios and incorporate into asset renewal plans where appropriate
Investigate opportunities for maintaining functional approaches to Doonella
Bridge and the ferry to Noosa North Shore
Foreshores and Ensure landscaping and species management/selection appropriately
Natural Areas considers inundation risks
Other No actions proposed.
Table 22 - Five-year action plan for responding to projected coastal inundation risks in Tewantin
Other shire-wide actions are also identified at the beginning of this Section 5.
41
epending on the location requirements, these may range in height up to 300mm in the case of raised footpaths,
D
or a height consistent with safety regulations in the case of barriers (e.g. approximately waist high)
Page 72
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.