Council archive · source document
2783 Colour 110713 · MCU13/0098
2000
22500
BIO RETENTION SYSTEM BRS 3/1
arp ica:
100 SLOTTED PVC WITH
CLEANOUT TO SURFACE
USING SCREW CAP.
ON SITE, ABOVE GROUND COMBINED
HARVESTING/RETENTION TANK WITH TOTAL
VOLUME OF 22,500 LITRES.
12,000 LITRE FOR RETENTION
10,500 LITRE FOR HARVESTING
300 HI-FLOW BYPASS BRS (NOT
SHOWN FOR CLARITY)
#90 LO-FLOW CHARGE ON TOP OF BRS
ON SITE, ABOVE GROUND COMBINED
HARVESTING/RETENTION TANK WITH TOTAL
VOLUME OF 22,500 LITRES.
12,000 LITRE FOR RETENTION
10,500 LITRE FOR HARVESTING
#300 HI-FLOW BYPASS BRS
#90 LO—FLOW CHARGE ON TOP OF BRS
ILTER MEDIUM SURFACE AREA WITH DENSE
PLANTING. FOR DETAILS OF SELECTED PLANTS SUCH
AS GRASSES, SHRUBS AND SELECTED TREES REFER
TO LANDSCAPE ARCHITECTS PLANS.
SL3.500
250 WIDE BATTER SURROUNDING BIO RETENTION SYSTEM.
ee: BATTER SHALL BE PROVIDED WITH ROCKS AND DENSE
oe PLANTING. FOR SELECTION OF PLANTS SUCH AS A
ae
BIO RETENTION SYSTEM BRS 3/1
SUBDRAINAGE LAYOUT
PLAN VIEW
MIXTURE OF GRASS, SHRUBS AND SELECTED TREES REFER
TO LANDSCAPE ARCHITECTS PLANS.
600sq HI-FLOW BYPASS AND
TRANSFER CHAMBER, CONCRETE WITH
ELEVATED GRATE AND WEIR AT
SL5.250
300 SYSTEM OUTFLOW
DIRECTED TO LAWFUL
POINT OF DISCHARGE
12,000 LITRE
RETENTION VOLUME
10,500 LITRE
HARVESTING VOLUME
300 HI-FLOW BYPASS
LOCATED UNDER BIO
RETENTION SYSTEM AND
CONNECTED TO SYSTEM
BYPASS CHAMBER AT
INVERT.
90 LOW-FLOW MITIGATION
DRAIN DISCHARGE TO TOP
OF BIO RETENTION SYSTEM
USING APPROVED FLAP
VALVE. CHARGE ON TOP OF
GRAVEL MATTRESS FOR
SCOUR PROTECTION.
600 FILTRATION ee
100 TRANSITION LAYER
200 DRAINAGE LAYER
250 EXTENDED DETENTION DEPTH
OOsq OVERFLOW AND HIGH
FLOW BYPASS CHAMBER,
CONCRETE WITH WEIR AT
SL5.250 AND HINGED,
ELEVATED GRATE.
5.300
5.000 y
y
4.400
4.300
NS 4.100
3 3.700
BIO RETENTION SYSTEM BRS 3/1
LONG SECTION
SECTION (Aa
SCALE 1: 201)
BIO RETENTION SYSTEM A NOTES
CATCHMENT: ROOF 1800m?
e FILTER MEDIUM AREA: 45m?
e¢ FORE BAY AREA: 1.5m?
e PROVIDE #100 SUBSOIL DRAINAGE WITH
CLEAN OUT POINTS AS INDICATED ON
PLAN.
250 EXTENDED DETENTION DEPTH
5.300
THE ENTIRE BRS TO BE ———
WRAPPED IN GEO TEXTILE
600 FILTRATION LAYER:
4.100
100 TRANSITION LAYER: _ Nes
3.700
200 DRAINAGE LAYER 0
#300 TO TRANSFER/BYPASS
CHAMBER
BIO RETENTION SYSTEM BRS 3/1
CROSS SECTION
SECTION /—B \
SCALE 1: 201)
NOTE:
IDENTICAL CONSTRUCTION PRINCIPLES
APPLY FOR BRS 3/2 AND BRS 3/3
#300 TO LAWFUL POINT OF
DISCHARGE
DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING
FOR ASSESSMENT, TENDERING AND CONSTRUCTION.
IS USED
[Amd Description
Issue Notes
For Development Approval] X
11-07-13
For Building Approval
For Tender
For Construction
As Constructed
E Hydraulic
PO Box 181
Moffat Beach, QLD, 4551
email: [email protected]
contact: Reinhold Koenning MiEAust RPEQ No 7023
PH: (07) 5491 4333 FX: (07) 5491 4233
NOOSAVILLE
INDUSTRIAL DEVELOPM
CLIENT
MARKRIS FOODS
ARCHITECT :
L SOUL SPACE J
(Prosect: 42 HOFFMAN DRIVE Y
ENT
DRAWING TITLE:
STORMWATER
QUALITY
DETAILS
Design| RK. Checked | Cu | Date 11—07—13 | Dwg. No. AMD.
\ SCALE: 1: 50 on At u.N.o.| 3 of 4 2783-3 J
RPD:— LOT 3 / FMR LOT 2 SP 222982
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2783 COLOUR 110713.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.