Council archive · source document
2783 Colour 110713 · MCU13/0098
a 60 ——-— NO RETENTION
oO
g 50: S WITH RETENTION
ty 40:
ADJACENT INDUSTRIAL ESTATE & 30. Zz ~
2 7 ~
S 70 _ oo =—
© 40 7 ~ ~
0 ! T I
2 4 6 8 10 12 14 16 18
rFOR DETAILS OF ROOF DRAINAGE REFER TO HYDRAULIC CONSULTANTS DRAWINGS
TIME (MINS.)
STORMWATER HYDROGRAPH THROUGH TANK
PEAK FLOW MITIGATION THROUGH ON SITE RETENTION TANK
| N - = = TOTAL PROPOSED TANK VOLUMES:
i COMBINED nN \ ee TANK FOR HARVESTING: 10,500 LITRE
ere} ere .
HARVESTING /RETENTION CE OOO eee Eee ee TANK FOR RETENTION: 12,000 LITRE
\ TANK, TYPE ABOVE Tee
\ GROUND. _| | | ~~ _
~~ TOTAL VOLUME | | ~ RUNOFF & DETENTION CALCULATIONS:
22,500LITRE | MAXIMUM EVENT: Q100
— DISCHARGE MINIMUM OF | | TIME OF CONCENTRATION: 5min
a 80% ROOF CATCHMENT | . INTENSITY: 326mm/hr
Tee AREA TO TANK. | y | SITE AREA: 3266sqm
IMPERVIOUS AREA: 2744sqm
| | PRE DEVELOPMENT PEAK RUNOFF: 260L/s
| & PEAK RUNOFF POST DEVELOPMENT: 290L/s (NO RETENTION)
\ | | |
ne A RETENTION VOLUME REQUIRED: 11,900 LITRE
~~ | ol |. —. 4}—-—-—--- RETENTION VOLUME PROVIDED: 12,000 LITRE
BIO RETENTION a
SYSTEM FOR\ | 9 | | ~ REDUCTION REQUIRED: 29.8L/s
ROOF CATCHMENT | |
MIN AREA 45sqm>\ | REDUCTION PROVIDED: 33.9L/s
~. |
9300 SHOWN BESIDE—— ||. | | FROM ROOF
BRS FOR CLARITY een
ONLY | a | =
IN
& TNT TTT TT VATTITTTIT NTT TTT TTT ITNT TTT TTT TTT NTT Nn TTT TTT TTT TTT TT TTT TTT MNT TT WTNKe- — HI-FLOW #300
~ BRS 3/1 rT? 3 Te
_ m
| %
wW bE
| gS 5
\ COMBINED ui
: heer HARVESTING / MITIGATION
\ wo
S Yt PROPOSED NEW WAREHOUSE BUILDING TANK 3
. 42000) TOTAL VOLUME:
\, A soa) O 22,500 LITRE
~ Le 50% HARVESTING YT )
~ 1L3.70 oO ~ |
ae & ~ Or eae ON LT 90 LO-FLOW SLOW
oe © 3b LEAK TO BIO
\ ~ iw RETENTION SYSTEM
S ee
7e5. N. 3
~~ GROUND
Se ~ NX NX N N NX N N N X« xX NO N\ X« ~~
-& FFL5.400 | ™-6 FFL5.400 [email protected] RAINWATER HARVESTING AND TO LAWFUL POINT OF DISCHARGE
MITIGATION TANK ASSEMBLEY
|_| SCALE: NTS
Ld ~
CARPARKING = ~
5 ~
S se
[email protected] FFL5.200 2 _
x ~~ DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
FOR ASSESSMENT, TENDERING AND CONSTRUCTION.
oN N [Amd Description Date
ee me DRIVEWAY ~
~~ 5/9.
10 oo CARPARKING
ie — 1L3.750:
1L3.510N Issue Notes Date
For Development Approval] X 11-07-13
Ne CARPARI For Building Approval
For Tender
_ LOT 3 PROPERTY CONNECTION
- _ 0375; 5.9m @ 1% For Construction
— USIL3.470 a.
so DSIL3.410 s Constructed
ae 225 BIO RETENTION BIO_ RETENTION
4175 1L3.510 L3.600 SYSTEM FOR SOUTH SYSTEM FOR
ee CARPARK NORTH CARPARK
oN CATCHMENT. CATCHMENT.
SV —=—EXISTING .
~ STORMWATER MIN AREA 11sqm MIN AREA 15sqm Hydraulic " 1
i MANHOLE 1/1:
se SL4.870 INTERNAL ACCESS ROAD (ROW)
se 1L3.555 y~ >|
aoe contact: Reinhold Koenning MiEAust RPEQ No 7023
= PO Box 181
~—— — SS — Moffat Beach, QLD, 4551
__ a 4 BE -4|75— a oo TT Te email: [email protected]
| = OS =< 4[5— ee ” PH: (07) 5491 4333 FX: (07) 5491 4233
_ ee ee oe oe CLIENT :
——— y MARKRIS FOODS
/ SITE ACCESS SITE ACCESS ARCHITECT -
/ \ SOUL SPACE
Z \ \ J
(Prosect: 42 HOFFMAN DRIVE »
NOOSAVILLE
R EF N €£ S T R & ET NBUBTRAE peveLorwenr
DRAWING TITLE:
STORMWATER
DRAINAGE
AND QUANTITY
Design RH, Checked] Ch | Date 11-07-13 | Dwg, No. AMD,
\ Scale: 1: 200 oN At uNo.| 2 of 4 2783-2 J
RPD:— LOT 3 / FMR LOT 2 SP 222982
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2783 COLOUR 110713.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.