Information Response MCU12/0216

of 8

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

3.    photographs of the Site should be taken and records kept for performance assessment over the monitoring
      period.

The EHP conditions of approval outline appropriate requirements for the rehabilitation of the Site which are
generally consistent with the mining lease rehabilitation requirements. The Rehabilitation Management Plan has
been prepared in accordance with these conditions. It is unreasonable to require a higher standard of rehabilitation
for extractive industry compared with the requirements of rehabilitation for the mining activities (e.g. extensive
planting schemes) because the two activities have an identical land disturbance footprint and impacts.

Information Required


5           Please provide written confirmation that the material quarried on-site is only to be used for works on the
            receiving site (Neales Quarry).

RESPONSE:
As mentioned in the Planning Assessment Report (reference: 1271_DA1_310_001) submitted to Council as part of
the Development Application, CSR confirm that the material quarried on-site will be utilised as clean fill in the
rehabilitation of CSR mining leases to the south of the Site in order to establish an appropriate landform to facilitate
post extraction land uses. The CSR owned mining leases to the south of the Site, to be rehabilitated, are described
as:



.     Neales Quarry: 125 Lake Macdonald Drive, Lake Macdonald QLD (described as Lot 8 on RP160703 and Lot 2
      on   RP852009); and
.     White Pit Quarry: 93 Lake Macdonald Drive, Lake Macdonald QLD (described as Lot 101 on SP142407, Lot
      140 on MCH978 and Lot 3 on RP137375).


Pursuant to Section 278 of the Sustainable Planning Act 2009, please accept this correspondence as a response
to all of the information requested.


Should you have any questions in relation to this matter, please do not hesitate to contact Mr Andrew Lyndon as
referenced below.



Yours faithfully



7j;;fUS
Clayton Hill
General Manager


Contact:              Andrew Lyndon, Manager of Planning and Environment
Email:                [email protected]

Enc/s:


.     Figure 10 Conceptual Rehabilitation Plan (Drawing No. 1271.049)
                 _




1271_da1_320_001_130402_1lro_council_response 10 info request.doc                                                     6
Log in to download the original file

Information Response MCU12_0216.pdf · 7.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.