Information Response MCU12/0216
~
Legend: Notes:
Monitoring of performance:
Site Boundary 1. Final batters to be no greater than 1:3 slope. 1. Monitoring of the vegetation establishment will be carried
Cadastral Boundary 2. Batters and floor of post extraction area to be grassed with a suitable out on a periodic basis as follows:
native pasture species (e.g Setaria sphacelata). 1.1. 1 month following seeding
Cadastral Boundary (Watercourse)
3. Pasture grass species selected will be subject to availability. 1.2. 3 months following seeding
_ Grass seeded rehabilitation 4. All site water storages will be retained for beneficial re-use as farm 1.3. 6 months following seeding
dams (ie for stock watering), not as treatment devices. No ongoing
_ Water Storage retained farm dam as
maintenance for treatment of water bodies will be required.
1.4. 12 months following seeding
2. Monitoring will investigate the following and data will be
recorded in a logbook or on field sheets:
2.1. occurrence of woody weeds (approximate coverage in
%,common name or species if known)
2.2. broad assessment of soil stability.
3. Photographs of the site should be taken and records kept
for performance assessment over the monitoring period
West Ridge Quarry Figure 10 Conceptual Rehabilitation Plan
-
Nearmap 2012. Image dat-= 20t’.11.()8
~ CSR Building Products Limited
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.