Original source · versioned page text
Attachment 8 - Bushfire Management Plan
Attached to the e-mail Response to Information Request - RAL18/0023.
Plans and drawings: the text below has words only, no drawings.
Report on Updated Bushfire Management Plan for Stockwell Development Group Pty Ltd
Undeveloped Area of Noosa Civic
13.35-08 The provision of fire hydrants with hose and reel on Lot
(Water) 12-15 exclusively for firefighting confirms a strong
response capacity for firefighting appliances.
The entire site has a reticulated water supply with
appropriate fire hydrants.
Complies
13.36-09 The proposed network of vehicular roads is adequate
(Vehicle Access and Fire for emergency vehicles.
Trails) Complies
13.37-010 The development nodes when cleared will be low
(Reconfiguring a Lot) bushfire risk areas and enhance the overall safety for
the entire development.
Complies
7. Conclusion
The proposed extension of the previously approved development will materially improve
the bushfire safety for the entire precinct.
The SPP Hazard Mapping confirms the need for a set of mitigating actions to ensure the
safety of people and property.
The details in section four of this Bushfire Management Plan confirm the capacity to
comply with the current Noosa Plan Natural Hazards Overlay Code.
L.S. Hawkes, B.Sc.(For), MIFA, MRFAQ
Senior Associate
(CV attached)
19-001 Updated Report – April 2019 Commercial-in-Confidence
Page 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.