Noosa Spit SEMP Final Report 100
Proposed Implementation Pathway
Table 5-1 Key Stages and Triggers for Proposed Management Actions
Stage 1 Period of Acceptable Risk
Resilience building Implement and/or continue ‘no regrets’ actions, namely:
actions • Review/update erosion studies; investigate funding sources for works; community
education and consultation; dune and habitat management; beach access management.
Shoreline monitoring to Continue monitoring program through upper beach surveys, hydrographic surveys, aerial
define current condition imagery analysis and modelling.
and understand trends
Develop a response Develop a response plan including:
plan (i.e. the SEMP) • Evaluate risk reduction options
• Concept planning for preferred option(s)
• Seek agency support
Define triggers for Commence planning for next stages of risk management:
enhanced • Trigger 1: limited recreational beach width and loss of vegetation, progress to Stage 2
management action management
• Trigger 2: the width of vegetated land above HAT has narrowed to 20 m (or less),
progress to Stage 3 management.
Stage 2 Risk Approaching Unacceptability
Trigger 1 is reached The first trigger for enhanced management action is realised, namely:
• Limited recreational beach width at Dog Beach and loss of vegetation
Risk reduction Develop and implement risk reduction measure:
management action: • Beach nourishment/sand plug concept design and approvals
beach
nourishment/sand plug • Detailed design and construction of beach nourishment/sand plugs
construction • Monitor shoreline and repeat works when Trigger 1 is reached (estimated every 5 years)
Shoreline monitoring to Continue monitoring program to quantify the benefit of Stage 2 management actions.
define current condition
and understand trends
Ongoing resilience Continue ‘no regrets’ actions, namely:
building actions • Review/update erosion studies; investigate funding sources for works; community
education and consultation; dune and habitat management; beach access management.
Review/update Review response plan and consider the need for an enhanced or alternative management
response plan approach.
Stage 3 Unacceptable Risk
Trigger 2 is reached The second trigger for enhanced management action is realised, namely:
• The frequency of beach nourishment/sand plug renewal is unsustainable; and/or
• The width of vegetated land above HAT has narrowed to 20 m (or less)
Risk reduction Consider the development and implementation of the following risk reduction measures:
management action: • Seawall concept design and approvals
seawall
• Seawall detailed design and construction
Shoreline and seawall Continue monitoring program through upper beach surveys; inspect condition of seawall.
monitoring
Ongoing resilience Continue ‘no regrets’ and permitted activities, namely:
building actions • Community education and consultation; habitat management; beach access
management; beach nourishment (if considered viable).
G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\R.B23636.001.02.SEMP_final.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.