Skip to the record
For the highest quality transcripts.

Council archive · source document

Decision Notice - 010.2007.00000738.001 [As Published] · 132007.738

of 20

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                          2007/738



Frontage Works
36.   A new full width concrete or paved path shall be constructed along the cul de sac frontage of
      the site in accordance with Council’s design standards. Care shall be taken to protect any
      existing vegetation and/or any underground services.
37.   All external and internal paths, driveways and parking areas shall be designed and
      constructed to ensure pedestrian safety using non-slip materials, to produce an evenly graded
      surface finish, and to be in accordance with the Disability Discrimination Act 1992 and
      Australian Standard 1428.1 Design for Access & Mobility.
38.   Any redundant vehicular crossings to the site shall be removed and replaced by kerb &
      channel, footpath paving and landscaping such as trees and grasses in accordance with
      Council’s Standard specifications prior to commencement of the use permitted by this permit.
Roof Water, Stormwater Drainage and Sewerage
39.   Roof runoff from any new /building shall be directed to a rainwater storage system or tank(s)
      that is installed to ensure water from the tank(s) is used for external uses (such as watering
      gardens, irrigation, ornamental ponds, water features, topping-up swimming pools, outdoor
      cleaning, etc) and for use in flushing of toilets internal to the building. All rainwater tanks are
      to be designed and installed in accordance with the Queensland Development Code (QDC)
      current at the time of building approval, and shall be part of the plumbing application for
      approval. The location and capacity of the tank/s shall be clearly shown on the plans
      submitted for Building Works / Operational Works approval and any overflow shall be directed
      to the stormwater detention drainage system proposed near the north eastern part of the site.
40.   All stormwater drainage of the site shall be designed and certified by a Registered
      Professional Civil Engineer and submitted to Council prior to obtaining a Development Permit
      for Operational Works. The stormwater drainage design shall give considerations to the
      following:
      40.1. The design shall be generally in accordance to Drawing No 06105 - 1 (A) dated 3
            November 2007 by Callaghan & Toth.
      40.2. The design shall take into consideration the findings and the recommendations of the
            Stormwater Quality Management and Assessment Report dated March 2007 prepared
            by Callaghan & Toth.
      40.3. The design shall include treatment train of rainwater detention/reuse tanks, gross
            pollutant traps/oil arrestors, Bio-Retention Basin/Unit and Raingardens to attenuate the
            stormwater runoff quality and quantity to the Pre Development levels. Calculation and
            data shall be provided to demonstrate that the EPA recommended water quality
            objectives will be achieved.
      40.4. All stormwater runoff from the paved areas on the site shall be disposed off via the
            treatment train.
      40.5. There shall be no concentration of stormwater flows that may cause environmental
            damage, erosion or siltation onto the downstream bushland due to the completed
            development or the construction phase of the site.
      40.6. To ensure no adverse impact on the proposed buildings on the site (particularly units
            facing the central access driveway), the design shall allow for secondary flowpath to
            cater for 100 years flows from within the site and from Gateway Drive. Improvement/s
            on the existing stormwater collection within Gateway Drive shall be included in the
            design and construction where necessary.
41.   To ensure that polluted run-off does not enter Council’s stormwater drainage system,
      stormwater run-off from the carparking areas and the driveways shall have the first flush (the
      first 12 mm of rainfall or hose-down) collected in a grease/oil arrestor/gross pollutant trap
      provided on site prior to being permitted to discharge into Council’s drainage system.
                                                                                      Page 5 of 20

Used in these records

About this file

File size
185 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2007.00000738.001 [As Published].pdf · 185 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.