      All other clean stormwater, such as roof water, can be collected on site and discharged
      through a single underground drain line directly into the existing drainage system, bypassing
      the grease/oil arrestor/gross pollutant trap.

      To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil
      arrestors/gross pollutant trap, which shall be submitted to the Council for approval prior to
      obtaining a Development Permit for Operational Works.

      The approved maintenance plan shall be incorporated in the Community Management
      Scheme for the development and a copy of this shall be provided for Council’s records prior to
      commencement of the approved Use.

      A Development Permit for Building Works shall not be granted until a Development Permit for
      Operational Works has been issued in regard to the drainage scheme.
42.   All site stormwater drainage shall be by means of a gravity system.
43.   The treatment train including the gross pollutant traps/oil arrestors, Bio-Retention Basin/Unit
      and Raingardens shall have three (3) years maintenance period from the date of the accepting
      the operational works on the site on maintenance.
      During the three years maintenance period the applicant shall monitor the quality of the
      stormwater runoff existing the site to ensure that water achieve the water quality objectives as
      set out by Council and generally as described by the Stormwater Quality Management and
      Assessment Report dated March 2007 prepared by Callaghan & Toth. Should the monitoring
      indicate that the objectives have not been met or indicate that objectives may not be met the
      applicant shall undertake the necessary works and/or upgrading works to ensure the
      objectives are achieved on a regular basis.
44.   The applicant shall provide a comprehensive ongoing stormwater quality monitoring,
      management and maintenance program for the stormwater treatment train on the
      development site including the water tanks and gross pollutants traps (GPTs). The
      management plan shall be submitted to the Council for approval in conjunction with obtaining
      a Development Permit for Operational Works.
      The approved maintenance plan must be incorporated in the Community Management
      Scheme for the development and a copy of this shall be provided for Council’s records prior to
      commencement of the approved Use.
45.   The site shall be connected to Council’s existing sewerage reticulation systems and be
      constructed in accordance with Council’s standards and requirements at no cost to Council.
46.   The design for the sewer layout on the site shall be generally in accordance to Drawing No
      06105 - 2 dated 3 November 2007 by Callaghan & Toth titled Proposed Site Layout Levels &
      Sewer Plan.
47.   Any building or structure within proximity of an easement or any other public utility’s
      underground must have its foundations designed so that no surcharge loads are imposed
      upon such underground infrastructure. Foundations must be taken down a minimum of 1.0m
      below a line of influence measured 1.0m in the direction of the foundation from the centreline
      of the closest underground service and along the natural angle of repose of the foundation soil
      type(s).
      Plans, and supportive documents, detailing these proposed foundations shall be designed by
      a registered practicing Geotechnical Engineer and submitted with the application for a
      Development Permit for Operational Works.
48.   There shall be no encroachments on Council easements by any buildings or structures (eg.
      ponds, retaining walls exceeding 1m in height, raised terraces, aboveground or underground
      water tanks, air conditioning units, ancillary buildings and the like).

                                                                                    Page 6 of 20

Used in these records

About this file

File size
185 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2007.00000738.001 [As Published].pdf · 185 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.