Council archive · source document
Decision Notice - 010.2007.00000738.001 [As Published] · 132007.738
2007/738
56. Earthworks carried out on site shall not affect the structural integrity of any of the existing
fences or structures that border the development site. Fences that are affected shall be
replaced prior to the Building Certifier issuing the Certificate of Classification. In this regard
any fences to be replaced shall be clearly shown on the plans submitted for Operational
Works approval.
57. Any filling works shall be retained with constructed walls that are designed and located to
minimise impacts on the vegetated buffers areas indicated on the approved plan of
development.
Acid Sulfate Soils
58. As the site is located below the 5m AHD, any excavation works or earth disturbance consisting
3 3
of 100m or greater and/or any filling works consisting of 500m or greater and with an
average depth of 0.5m or greater will need to be carried out in accordance with State Planning
Policy 2/02 Planning and Managing Development Involving Acid Sulfate Soils. In this regard
appropriate testing and supporting documentation prepared by a suitably qualified specialist
shall be submitted to Council for approval prior to obtaining a Development Permit for
Operational Works.
59. Excavated soil shall be lime treated in accordance with the recommendations of the Acid
Sulfate Soil Investigation dated August 2003 by Golder Associates Pty Ltd.
Environmental
60. The applicant shall provide a professionally prepared Environmental Management Plan (EMP)
for the site to be submitted to Council for approval prior to obtaining a Development Permit for
Operational Works. The management plan shall be for the construction phase and the
operational phase of the development and shall address:-
60.1. Management of the naturally acidic soils identified on the site;
60.2. Protection of vegetation with the Environmental Buffer and Landscaped Buffer areas;
60.3. Run-off water quality management, sediment and erosion control;
60.4. Vegetation removal and disposal, including the use of fauna spotter;
60.5. Removal of environmental weeds; &
60.6. Rehabilitation of disturbed areas within the identified buffer areas.
61. All Class 1, Class 2 and Class 3 pest plants declared under the Land Protection (Pest and
Stock Route Management) Act 2002 are to be controlled on the site prior to Council
endorsement of the plan of survey. In this context “controlled” shall mean, for class 1 and 2
pests, completely eradicated. For class 3 pests it shall mean removal of the plants where they
threaten environmentally significant areas of the site such as riparian zones and areas of
natural vegetation.
Where class 3 plants are removed as a result of this condition and there is not sufficient
natural regeneration of native species, the areas shall be replanted with endemic native
species so that a sustainable natural ecosystem is restored.
Council’s Conservation Management Supervisor will not inspect the site until 30 days after the
weed treatment and replanting is complete.
62. A Vegetation Protection Area shall be provided in the northeast corner of the property as
indicated on drawing the approved plan and as recommended by the Ecological Survey
prepare by Pederson Biological and Environmental dated 15 April 2003. This area shall be of
a triangular shape, with corners being approximately 54 metres along the northern boundary
and 37 metres along the eastern boundary from the northeastern corner of the property.
Page 8 of 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2007.00000738.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 185 KB (small file)
- File type
No other editions are linked here.