Original source · versioned page text
DEHP Concurrence Agency Reponse
’";"i")-_
t,:I:
.".. i c!~~_
...!...
-.
II .
r. ,,!,
~ p
li~iiiijjiM~
B0604322
,-
~
Notice
Concurrence Agency Response
This notice is issued by the chief executive pursuant to section 287 (concurrence agency response) of the Sustainable
.
Planning Act 2009.
Sunshine Coast Regional Council cc. Jennifer Alizzi
Locked Bag 72 C/- Vasard Marine Pty Ltd,
SUNSHINE COAST MAIL CENTRE 169 First Avenue
BRIBIE ISLAND QLD 4507
[email protected]
Attention: Simon Aalbers Attention: Rob Donaldson
Our reference: SPCC0486912 -
SOR/114579
Re: Concurrence Agency Response 8(5 /113’1 mY
1. Application details
I Box: ....?/;j~/... R: .....Jq.........1
OPWIJ 10227
Applicant: Jennifer Alizzi C/- Vasard Marine Pty Ltd
Assessment Manager ref: OPW12/0287
Date application referred to the concurrence agency: 22 October 2012
Development approval applied for: Development permit
Aspect(s) of development:
Assessable development Referral agency reference
Operational work -
Tidal Sustainable Planning EHP Application ref. -
506581
works, or development in a Regulation 2009 -
Schedule EHP Permit No. SPCC0486912
coastal management district 7, table 2, item 13
tidal works Pontoon)for a I2riv~
Development description(s):
I FPerational ’-Yorks (Prescribed
’etty structur~
-
Property/Location description(s): 10 Noosa Parade, Noosa Heads
Lot 4 RP 183112
2. Concurrence jurisdiction
The concurrence agency response for the concurrence agency referral jurisdiction for the aspect of
development involved with the application the subject of this Notice is to tell the assessment
manager as follows:
a. Conditions must attach to any development approval, and those conditions are attached to
this notice as:
i) Attachment 1 -
EHP Permit No. SPCC0486912
Page 1 of 2 .120829 . EM700 . Version 2A
~Queensland
Department of Environment and Heritage Protection
www.ehp.qld.gov.au ABN 46 640 294 485 ..
Government
[OCR of page images]
SCC CORRESPONDENCE
wit
Notice
Concurrence Agency Response
This notice is issued by the chief executive pursuant to section 287 (concurrence agency response) of the Sustainable
Planning Act 2009.
Sunshine Coast Regional Council ce. Jennifer Alizzi
Locked Bag 72 C/- Vasard Marine Pty Ltd,
SUNSHINE COAST MAIL CENTRE 169 First Avenue
BRIBIE ISLAND QLD 4507
[email protected]
Attention: Simon Aalbers Attention: Rob Donaldson
Our reference: SPCC0486912 — SOR/114579
Re: Concurrence Agency Response BCS 1434 mT
Application details a
OP Wa [0287
Applicant: Jennifer Alizzi C/- Vasard Marine Pty Ltd
Assessment Manager ref: OPW12/0287
Date application referred to the concurrence agency: 22 October 2012
Development approval applied for: Development permit
Aspect(s) of development:
Assessable development Referral agency reference
Operational work — Tidal Sustainable Planning EHP Application ref. — 506581
works, or development in a Regulation 2009 —- Schedule | EHP Permit No. SPCC0486912
coastal management district 7, table 2, item 13
Development description(s):
Property/Location description(s): 10 Noosa Parade, Noosa Heads
Lot 4 RP 183112
Concurrence jurisdiction
The concurrence agency response for the concurrence agency referral jurisdiction for the aspect of
development involved with the application the subject of this Notice is to tell the assessment
manager as follows:
a. Conditions must attach to any development approval, and those conditions are attached to
this notice as:
i) Attachment 1 - EHP Permit No. SPCC0486912
Page 1 of 2 * 120829 * EM700 « Version 2A
Department of Environment and Heritage Protection
www.ehp.qid.gov.au ABN 46 640 294 485
Queensland
Government
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (DEHP Concurrence Agency Reponse.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 5 pages
Page 2
r-------
4
~
Notice
Concurrence Agency Response
.
Approved plans and specifications
Document no. Document name Date
Structural Design Certificate for Pontoons/Walkways
Certificate 27 June 2012
Ian Barnes and Associates RPEQ Number 3333
Drawings No. A2- Pontoon and Walkway details Prepared by Ian Barnes & 22 January 2001
52425-01-E
Associates
Drawings NO.A2- Pontoon and Walkway details Prepared by Ian Barnes &
22 January 2001
52425-02-D Associates
NP-404/1 Noosa Inlet Bank Profile, 27 June 2012
Site Plan, prepared by Bribie Pontoons Vasard Marine
-
SP-404/1 27 June 2012
Pty Ltd
3. General advice to assessment manager
Pursuant to section 334 and section 363 of the Sustainable Planning Act 2009, a copy of a decision
notice or negotiated decision notice issued by the assessment manager must be forwarded to the
referral agency for the relevant application. Please send a copy of the relevant notice to <INSERT
EHP office name and postal address> and an electronic copy to [email protected] state’s Native Title Work Procedures provide that responsibility for assessment of native title
issues for an IDAS application rests with the assessment manager.
./
4. Additional information for applicants
Contaminated land
It is a requirement of the Environmental Protection Act 1994 that if an owner or occupier of land
becomes aware a Notifiable Activity (as defined in Schedule 3 and Schedule 4 of the Environmental
Protection Act 1994) is being carried out on the land, or that the land has been, or is being,
contaminated by a hazardous contaminant, the owner or occupier must, within 22 business days
after becoming so aware, give written notice to the chief executive.
Delegate Enquiries
Ben Sale Brad Dines
Delegate, Chief Executive administering the Coastal Department of Environment and Heritage
Protection and Management Act 1995. Protection
Department of Environment and Heritage Protection PO Box 632 MAROOCHYDORE
14 November 2012 Phone: 54596153
Email: [email protected]
Attachment(s)
Attachment 1 -
EHP Permit No. SPCC0486912
Information Sheet -
Appeals -
Sustainable Planning Act 2009 (extract from the Sustainable Planning Act
2009)
Page 2 of 2 120829
. .EM700 Version 2A
.
Department of Environment and Heritage Protection
[OCR of page images]
Notice
Concurrence Agency Response
Approved plans and specifications
Document no.
Document name Date
Structural Design Certificate for Pontoons/Walkways
lan Barnes and Associates RPEQ Number 3333
Certificate 27 June 2012
Drawings No. A2- | Pontoon and Walkway details Prepared by lan Barnes &
52425-01-E y p y 22 January 2001
Associates
Drawings No.A2- | Pontoon and Walkway details Prepared by lan Barnes &
52425-02-D Associates 22 danas 200"
NP-404/1 Noosa Inlet Bank Profile, 27 June 2012
Site Plan, prepared by Bribie Pontoons — Vasard Marine
SP-404/1 Pty Ltd prep Y 27 June 2012
General advice to assessment manager
Pursuant to section 334 and section 363 of the Sustainable Planning Act 2009, a copy of a decision
notice or negotiated decision notice issued by the assessment manager must be forwarded to the
referral agency for the relevant application. Please send a copy of the relevant notice to <INSERT
EHP office name and postal address> and an electronic copy to [email protected] state’s Native Title Work Procedures provide that responsibility for assessment of native title
issues for an IDAS application rests with the assessment manager.
Delegate, Chief Executive administering the Coastal
Protection and Management Act 1995.
Department of Environment and Heritage Protection
14 November 2012
Attachment(s)
Protection
Phone: 5459 6153
4. Additional information for applicants
Contaminated land
It is a requirement of the Environmental Protection Act 1994 that if an owner or occupier of land
becomes aware a Notifiable Activity (as defined in Schedule 3 and Schedule 4 of the Environmental
Protection Act 1994) is being carried out on the land, or that the land has been, or is being,
contaminated by a hazardous contaminant, the owner or occupier must, within 22 business days
after becoming so aware, give written notice to the chief executive.
Delegate Enquiries
Ben Sale Brad Dines
Department of Environment and Heritage
PO Box 632 MAROOCHYDORE
Email: [email protected]
Attachment 1 - EHP Permit No. SPCC0486912
Information Sheet — Appeals — Sustainable Planning Act 2009 (extract from the Sustainable Planning Act
2009)
Page 2 of 2 * 120829 » EM700 + Version 2A
Department of Environment and Heritage Protection
Page 3
’J
’",’fit," .,
!,i
Iii
’r~i.....";:i,.;’:
J.’" _’tJ’: t\. >" ,
j
rt::;;’;’.’1C.
’::~:;(;~ ~
.,;
~j3,.
~~~-.;l.
’-:,
1;:,:~{: .
:- ~!, :~
-"\’:
1.,",_, ~
~
I’
~
, ..,...,
w
l.~,’.~~,:!
~ ~;J<.’
’cC~1."
Sustainable Planning Act 2009
1
EHP Permit number: SPCC04896912
Assessment manager reference (if OPW12/0287
any):
Date application received: 22 October 2012
Permit type: Concurrence agency response
Date of decision: 14 November 2012
Decision: Concurrence agency response
conditions that must attach to any development approval
Relevant laws and policies: Coastal Protection and Management Act 1995 and
Sustainable Planning Act 2009 and any related statutory
instruments and subordinate legislation
Jurisdiction(s): Referral jurisdiction the subject of the application prescribed by
Schedule 7, table 2, item 13 of the Sustainable Planning
Regulation 2009.
Development Description(s)
Property/Location Development
10 Noosa Parade, NOOSA Lot 4 RP 183112 Operational work -
Tidal works, or development in a
HEADS coastal management district -
Tidal work that is
prescribed tidal work (e.q. ietties, pontoons, ramps)
Reason(s) for inclusion of conditions
In accordance with section 289 of the Sustainable Planning Act 2009, the reason(s) for inclusion of conditions
stated in this permit required by the concurrence agency response for the application are as follows.
. The Department of Environment Heritage Protection is recognised as a concurrence agency under the
Sustainable Planning Regulation 2009 for coastal management, other than amenity and aesthetic
significance or value, Development conditions placed on the development approval for the application are
in accordance with section 106 of the Coastal Protection and Management Act 1995.
The Activity for which this development approval is issued is simply a restatement of the activity as prescribed
in the legislation at the time of issuing this development approval. Where there is any conflict between the
above description of the Activity for which this development approval is issued and the conditions as specified
1
Permit includes licences, approvals, permits, authorisations, certificates, sanctions or equivalenUsimilar as required by legislation
administered by the Department of Environment and Heritage Protection.
Page 1 of 3 .120607 .Version 1
Department of Environment and Heritage Protection
www.ehp.qld.gov.au ABN 46 640 294485
.QueenslandGovernment
[OCR of page images]
Sustainable Planning Act 2009
EHP Permit ‘ number: SPCC04896912
Assessment manager reference (if OPW12/0287
any):
Date application received: 22 October 2012
Permit type: Concurrence agency response
Date of decision: 14 November 2012
Decision: Concurrence agency response
conditions that must attach to any development approval
Relevant laws and policies: Coastal Protection and Management Act 1995 and
Sustainable Planning Act 2009 and any related statutory
instruments and subordinate legislation
Jurisdiction(s): Referral jurisdiction the subject of the application prescribed by
Schedule 7, table 2, item 13 of the Sustainable Planning
Regulation 2009.
Development Description(s)
Property/Location Development
10 Noosa Parade, NOOSA | Lot 4 RP 183112 Operational work - Tidal works, or development in a
HEADS coastal management district - Tidal work that is
prescribed tidal work (e.g. jetties, pontoons, ramps)
Reason(s) for inclusion of conditions
In accordance with section 289 of the Sustainable Planning Act 2009, the reason(s) for inclusion of conditions
stated in this permit required by the concurrence agency response for the application are as follows.
° The Department of Environment Heritage Protection is recognised as a concurrence agency under the
Sustainable Planning Regulation 2009 for coastal management, other than amenity and aesthetic
significance or value. Development conditions placed on the development approval for the application are
in accordance with section 106 of the Coastal Protection and Management Act 1995.
The Activity for which this development approval is issued is simply a restatement of the activity as prescribed
in the legislation at the time of issuing this development approval. Where there is any conflict between the
above description of the Activity for which this development approval is issued and the conditions as specified
* Dermit includes licences, approvals, permits, authorisations, certificates, sanctions or equivalent/similar as required by legislation
administered by the Department of Environment and Heritage Protection.
Page 1 of 3 * 120607 « Version 1
Department of Environment and Heritage Protection © Queensland Government
www.ehp.qid.gov.au ABN 46 640 294 485
Page 4
~
EHP Permit number: SPCC0486912
.
in this development approval as to the scale, intensity or manner of carrying out of the Activity, then such
conditions prevail to the extent of the inconsistency.
This development approval authorises the Activity. It does not authorise environmental harm unless a
t
concurrence agency condition within this development approval explicitly authorises that harm. Where there is
development approval is silent on a matter, the lack of a condition or silence shall not be
no condition, or the
construed as authorising harmAs part of the concurrence agency response the following development
conditions are to be attached to the development approval:
Delegate
Ben Sale
Delegate, Chief Executive administering the Coastal Protection
and Management Act 1995.
Department of Environment and Heritage Protection
14 November 2012
Page 2 of 3 120607
. Version 1
.
Department of Environment and Heritage Protection
[OCR of page images]
EHP Permit number: SPCCO486912
in this development approval as to the scale, intensity or manner of carrying out of the Activity, then such |
conditions prevail to the extent of the inconsistency. °
This development approval authorises the Activity. It does not authorise environmental harm unless a *
concurrence agency condition within this development approval explicitly authorises that harm. Where there is
no condition, or the development approval is silent on a matter, the lack of a condition or silence shall not be
construed as authorising harmAs part of the concurrence agency response the following development
conditions are to be attached to the development approval:
Delegate
Ben Sale
Delegate, Chief Executive administering the Coastal Protection
and Management Act 1995.
Department of Environment and Heritage Protection
14 November 2012
Page 2 of 3 * 120607 « Version 1 Department of Environment and Heritage Protection
Page 5
EHP Permit number: SPCC0486912
CONDJTIONS
Agency Interest -
General
1. All works are to be constructed in accordance with the attached approved drawings and specifications
listed in the approved plans section in the notice attached to this permit.
2. All materials and works must comply with Australian Standards.
3. An appropriate spill kit, personal protective equipment and relevant operator instructions/emergency
procedure guides for the management of fuel and chemicals associated with the operational works stage
must be kept on site.
4. Anyone working under this approval must be trained in the use of the spill kit.
5. Telephone the Department of Environment and Heritage Protection (EHP)Pollution Hotline on
1300130372 or local office on (07)54596132 immediately after becoming aware of any release of
contaminants or other breach of condition, not in accordance with the conditions of this approval.
6. The construction and installation of the works must not result in any adverse impacts on the surrounding
environment, nor cause any long-term maintenance and management implications.
7. Should the works result in adverse impacts, the permit holder is responsible for rectification works and
where necessary the removal of the works causing impacts.
8. The chief executive administering the Coastal Protection and Management Act 1995 may order the works
to be removed or modified within a reasonable time, if the works have or are likely to have a
significant effect on coastal management because the works:
(i) create a danger to the public; or
(ii) cause erosion or land degradation; or
(iii) are unstable; or
(iv) have not been constructed according to the approved plans.
Agency Interest - Land
9. No sand is to be removed from the coastal dune system or active beach system within the erosion prone
area or coastal management district.
10. Spoil removed from within the proposed development area must be stockpiled separately upon
excavation, and reused, rather than disposed of.
11. Best practice erosion and sediment control measures must be implemented and maintained to minimise
erosion and the release of sediment.
Agency Interest -
Vegetation
12. All works must be undertaken in a manner that minimises damage to the native vegetation on and
adjacent to the site.
13. There must be no death or permanent removal of marine plants, inter-tidal plants or native terrestrial
woody vegetation outside of the disturbance footprint as indicated within the attached approved plans, as
a result of these works.
Agency Interest -
Water
14. All materials used in the construction of the woks must be:
(v) clean and free of silt; and
(vi) suitable for the purpose having regard to the location of the land and to the proposed use of the
land.
15. The development must maintain local and regional drainage and hydrological systems.
16. The development must not result in a change in water chemistry that will impact on ecological values on
or off site.
17. Stockpiles of waste, spoil or other contaminated material must not be stored within thirty (30)metres of
the high water mark.
18. Chemical, waste, fuel or oil storage onsite must be appropriately bunded to contain the full volume of the
stored material.
END OF CONDITIONS
f
Page 3 of 3 120607 Version 1
. .
Department of Environment and Heritage Protection
[OCR of page images]
EHP Permit number: SPCC0486912
CONDITIONS
Agency Interest — General
1.
2.
3.
All works are to be constructed in accordance with the attached approved drawings and specifications
listed in the approved plans section in the notice attached to this permit.
All materials and works must comply with Australian Standards.
An appropriate spill kit, personal protective equipment and relevant operator instructions/emergency
procedure guides for the management of fuel and chemicals associated with the operational works stage
must be kept on site.
Anyone working under this approval must be trained in the use of the spill kit.
Telephone the Department of Environment and Heritage Protection (EHP) Pollution Hotline on
1300 130 372 or local office on (07) 5459 6132 immediately after becoming aware of any release of
contaminants or other breach of condition, not in accordance with the conditions of this approval.
The construction and installation of the works must not result in any adverse impacts on the surrounding
environment, nor cause any long-term maintenance and management implications.
Should the works result in adverse impacts, the permit holder is responsible for rectification works and
where necessary the removal of the works causing impacts.
The chief executive administering the Coastal Protection and Management Act 1995 may order the works
to be removed or modified within a reasonable time, if the works have or are likely to have a
significant effect on coastal management because the works:
(i) create a danger to the public; or
(ii) | Cause erosion or land degradation; or
(iii) are unstable; or
(iv) have not been constructed according to the approved plans.
Agency Interest — Land
9.
10.
11,
No sand is to be removed from the coastal dune system or active beach system within the erosion prone
area or coastal management district.
Spoil removed from within the proposed development area must be stockpiled separately upon
excavation, and reused, rather than disposed of.
Best practice erosion and sediment control measures must be implemented and maintained to minimise
erosion and the release of sediment.
Agency Interest — Vegetation
12.
13.
All works must be undertaken in a manner that minimises damage to the native vegetation on and
adjacent to the site.
There must be no death or permanent removal of marine plants, inter-tidal plants or native terrestrial
woody vegetation outside of the disturbance footprint as indicated within the attached approved plans, as
a result of these works.
Agency Interest — Water
14.
15.
16.
17.
18.
All materials used in the construction of the woks must be:
(v) clean and free of silt; and
(vi) suitable for the purpose having regard to the location of the land and to the proposed use of the
land.
The development must maintain local and regional drainage and hydrological systems.
The development must not result in a change in water chemistry that will impact on ecological values on
or off site.
Stockpiles of waste, spoil or other contaminated material must not be stored within thirty (30) metres of
the high water mark.
Chemical, waste, fuel or oil storage onsite must be appropriately bunded to contain the full volume of the
stored material.
END OF CONDITIONS
Page 3 of 3 * 120607 « Version 1 Department of Environment and Heritage Protection
Page 6
Queensland
Government POSTAGE
Department of Environment & Heritage PAID
.
PO Box 362
MAROOCHYDORE QLD 4558 AUSTRAlIA
Sunshine Coast Regional Council
Attention: Mr Simon Aalbers
L cked Bag 72
SUNSHINE COAST MAIL CENTRE
NAMBOUR QLD 4560
~
-~,l\."
i.,
,
,’$" :i’"
’saOJnos peUOJIUOO pue SISeJOl pe6euew ~lqeull!ISnS WOJl S! IOl)pOJd S!lU
~, ’,’"’, ~’ ",’,,1I1l-l&-lO/S:I\f pJ,PUBJS !qsaJO:I uelle.qsnv
J.~/~,~
~~t~ t~ ’~~~.
:
...:t,;~")~"
,1, ,ii;.’*’},
’
~’,,~../tJ; .~
;;1;;’ ..til j ,-
~~" ,{
[OCR of page images]
Registered Post
Prepaid Label () POST
Queensland
Government
Department of Environment & Heritage Protectig
PO Box 362 _
MAROOCHYDORE QLD 4558
Sunshine Coast Regional Council
Attention: Mr Simon Aalbers
Locked Bag 72
SUNSHINE COAST MAIL CENTRE
NAMBOUR QLD 4560
*Se0INOS Pe}jO.UOD Pues}sel0) peBeuew Ajqeuyeysns wo s13oNpoid siyL
80-1£-10/S4V PAepueys Aqsaioy ueyeqsny