Original source · versioned page text
DEHP Concurrence Agency Reponse
r-------
4
~
Notice
Concurrence Agency Response
.
Approved plans and specifications
Document no. Document name Date
Structural Design Certificate for Pontoons/Walkways
Certificate 27 June 2012
Ian Barnes and Associates RPEQ Number 3333
Drawings No. A2- Pontoon and Walkway details Prepared by Ian Barnes & 22 January 2001
52425-01-E
Associates
Drawings NO.A2- Pontoon and Walkway details Prepared by Ian Barnes &
22 January 2001
52425-02-D Associates
NP-404/1 Noosa Inlet Bank Profile, 27 June 2012
Site Plan, prepared by Bribie Pontoons Vasard Marine
-
SP-404/1 27 June 2012
Pty Ltd
3. General advice to assessment manager
Pursuant to section 334 and section 363 of the Sustainable Planning Act 2009, a copy of a decision
notice or negotiated decision notice issued by the assessment manager must be forwarded to the
referral agency for the relevant application. Please send a copy of the relevant notice to <INSERT
EHP office name and postal address> and an electronic copy to [email protected] state’s Native Title Work Procedures provide that responsibility for assessment of native title
issues for an IDAS application rests with the assessment manager.
./
4. Additional information for applicants
Contaminated land
It is a requirement of the Environmental Protection Act 1994 that if an owner or occupier of land
becomes aware a Notifiable Activity (as defined in Schedule 3 and Schedule 4 of the Environmental
Protection Act 1994) is being carried out on the land, or that the land has been, or is being,
contaminated by a hazardous contaminant, the owner or occupier must, within 22 business days
after becoming so aware, give written notice to the chief executive.
Delegate Enquiries
Ben Sale Brad Dines
Delegate, Chief Executive administering the Coastal Department of Environment and Heritage
Protection and Management Act 1995. Protection
Department of Environment and Heritage Protection PO Box 632 MAROOCHYDORE
14 November 2012 Phone: 54596153
Email: [email protected]
Attachment(s)
Attachment 1 -
EHP Permit No. SPCC0486912
Information Sheet -
Appeals -
Sustainable Planning Act 2009 (extract from the Sustainable Planning Act
2009)
Page 2 of 2 120829
. .EM700 Version 2A
.
Department of Environment and Heritage Protection
[OCR of page images]
Notice
Concurrence Agency Response
Approved plans and specifications
Document no.
Document name Date
Structural Design Certificate for Pontoons/Walkways
lan Barnes and Associates RPEQ Number 3333
Certificate 27 June 2012
Drawings No. A2- | Pontoon and Walkway details Prepared by lan Barnes &
52425-01-E y p y 22 January 2001
Associates
Drawings No.A2- | Pontoon and Walkway details Prepared by lan Barnes &
52425-02-D Associates 22 danas 200"
NP-404/1 Noosa Inlet Bank Profile, 27 June 2012
Site Plan, prepared by Bribie Pontoons — Vasard Marine
SP-404/1 Pty Ltd prep Y 27 June 2012
General advice to assessment manager
Pursuant to section 334 and section 363 of the Sustainable Planning Act 2009, a copy of a decision
notice or negotiated decision notice issued by the assessment manager must be forwarded to the
referral agency for the relevant application. Please send a copy of the relevant notice to <INSERT
EHP office name and postal address> and an electronic copy to [email protected] state’s Native Title Work Procedures provide that responsibility for assessment of native title
issues for an IDAS application rests with the assessment manager.
Delegate, Chief Executive administering the Coastal
Protection and Management Act 1995.
Department of Environment and Heritage Protection
14 November 2012
Attachment(s)
Protection
Phone: 5459 6153
4. Additional information for applicants
Contaminated land
It is a requirement of the Environmental Protection Act 1994 that if an owner or occupier of land
becomes aware a Notifiable Activity (as defined in Schedule 3 and Schedule 4 of the Environmental
Protection Act 1994) is being carried out on the land, or that the land has been, or is being,
contaminated by a hazardous contaminant, the owner or occupier must, within 22 business days
after becoming so aware, give written notice to the chief executive.
Delegate Enquiries
Ben Sale Brad Dines
Department of Environment and Heritage
PO Box 632 MAROOCHYDORE
Email: [email protected]
Attachment 1 - EHP Permit No. SPCC0486912
Information Sheet — Appeals — Sustainable Planning Act 2009 (extract from the Sustainable Planning Act
2009)
Page 2 of 2 * 120829 » EM700 + Version 2A
Department of Environment and Heritage Protection
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (DEHP Concurrence Agency Reponse.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.