Original source · versioned page text
BR190571 BP Noosaville - Preliminary Construction Management Plan
Original PDF page 11, section 1. The text section number identifies this passage in the reader.
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn6 Contact and Compliant Management Procedures 6.1 Contact Details Signage will be displayed at all entrances to the site and at various points on the perimeter fencing and hoarding, that describes: The construction company including contact names and phone numbers The site as a construction site, accessible to workers and authorised personnel only The location of the site office The mandatory hardhat and safety footwear requirements. 6.2 Dispute Resolution Procedures To be confirmed by the contractor. 6.3 Communication To be confirmed by the contractor. P:\BR19\BR190571 BP Noosaville\Reports\CMP\BR190571 BP Noosaville - CMP.docx Page 11 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.