Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

BR190571 BP Noosaville - Preliminary Construction Management Plan

of 16

Page text shows just the words. Original shows the document exactly as it was published.

Original PDF page 11, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
6         Contact and Compliant Management Procedures
 6.1      Contact Details
Signage will be displayed at all entrances to the site and at various points on the perimeter fencing and
hoarding, that describes:
   The construction company including contact names and phone numbers
   The site as a construction site, accessible to workers and authorised personnel only
   The location of the site office
   The mandatory hardhat and safety footwear requirements.

 6.2      Dispute Resolution Procedures
To be confirmed by the contractor.

 6.3      Communication
To be confirmed by the contractor.




 P:\BR19\BR190571 BP Noosaville\Reports\CMP\BR190571 BP Noosaville - CMP.docx                               Page 11 of 13
Log in to download the original file

BR190571 BP Noosaville - Preliminary Construction Management Plan.pdf · 2.0 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.