Skip to the record
Search everything, all in one place.

Original source · versioned page text

BR190571 BP Noosaville - Preliminary Construction Management Plan

of 16

Page text shows just the words. Original shows the document exactly as it was published.

Original PDF page 10, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
5         Environmental Management
 5.1      Sediment and Erosion Control
Sediment and Erosion control will be implemented for the duration of the project for the different
applications on site as they arise and generally in accordance with the Sediment and Erosion Control
Plans done by ACOR Consultants.

 5.2      Dust Control
Dust control will be managed during construction through:
   Cleaning (i.e. Sweeping) of hardstand surfaces
   Wetting down of exposed surfaces as required
   Loads to be secured and covered before leaving site
   With the concrete construction there will be minimal dust during the demolition and reconstruction
    phase.

 5.3      Waste Management
A number of wheelie bins will be located on site at various points including adjacent the lunchroom and
site office. These will be empties daily into the main site skip bins. The skip bins will be services as
required. The amount of skip ins provided will be allocated according to site requirements.

 5.4      Water Quality Objectives During Construction Phase
   Control measures to be put in place to protect downstream properties from nuisance flows.
   Maximum of 50mg/L of total suspended solids present in run-off discharged from the site during
    the construction stage, and a pH between 8 and 8.5




 P:\BR19\BR190571 BP Noosaville\Reports\CMP\BR190571 BP Noosaville - CMP.docx                              Page 10 of 13
Log in to download the original file

BR190571 BP Noosaville - Preliminary Construction Management Plan.pdf · 2.0 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.