BR190571 BP Noosaville - Preliminary Construction Management Plan

of 16

Page text shows just the words. Original shows the document exactly as it was published.

Original PDF page 5, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
1         Introduction
 1.1      Purpose
The purpose of the Construction Management Plan (CMP) is to:

   Provide Guidance for the implementation of project management and site management processes
    for construction of the redevelopment at BP Noosaville.

   Ensure compliance with the project management and safety systems

   Ensure compliance with authority requirements

   Identify related approvals and procedures

 1.2      Scope
ACOR Consultants has prepared this Preliminary Construction Management Plan (CMP) outlining key
construction elements associated with the development at 52-54 Mary Street, Noosaville QLD 4566.
Whilst final and ongoing construction logistics will be managed by the contractor/site manager and
communicated through consultation with the assigned Noosa Council engineering assessment officer
and relevant authorities, this document establishes preliminary parameters by which the contractor and
other parties will undertake works related to:

   Public and site personal access

   Public and site personnel safety

   Environmental management

   Site logistics (traffic and pedestrian control, amenities)

   Materials handling

   Site security
Any addition authority approvals/ permits that may be required as a result of this plan will be sought as
required.




 P:\BR19\BR190571 BP Noosaville\Reports\CMP\BR190571 BP Noosaville - CMP.docx                               Page 5 of 13
Log in to download the original file

BR190571 BP Noosaville - Preliminary Construction Management Plan.pdf · 2.0 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.